あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
35-440 T/H CFB Type Steam Boiler for Power Plant
Next

35-440 T/H CFB Type Steam Boiler for Power Plant

离岸价格

Get Latest Price

500000 ~ 700000 / Unit ( Negotiable )

|

1 Minimum Order

国:

China

モデル番号:

SHX130-4.2/450-AII

离岸价格:

500000 ~ 700000 / Unit ( Negotiable ) Get Latest Price

ロケーション:

-

最低注文量の価格:

500000 per Unit

最低注文量:

1

パッケージの詳細:

Standard packing

納期:

90 days

供給能力:

100 Unit per Year

支払いタイプ:

D/P, D/A, L/C, T/T

製品グループ :

今すぐお問い合わせください
無料会員

連絡先担当者 SHAWN

Shanghai, Shanghai

今すぐお問い合わせください

製品仕様

  • Name:power plant boiler
  • know more from our website:loyaltop.com

タイトルまたは説明

*****0 T/H CFB Type Steam Boiler for Power Plant

Welcome to Visit us in Shanghai China, or inquiry more information from my eamil: , or our website: sinoboilers . com

1) The Series of our Utility Boilers for 6MW, *2MW, *5MW power station .
Parameter/Data/Type    WB**5/3.**-M    WB**5/5.*-M    WB***0/5.*-M
Rated evaporation capacity    t/h    *5    *5    **0
Super heated steam outlet temperature    â„ƒ    **0    **5    **5
Super heated steam outlet pressure    MPa    3.*2    5.3    5.3
Rated Water-supply temperature    â„ƒ    **0    **0    **0
Fuel available    Low quality soft coal、coal gangue、lean coal    Low quality soft coal、coal gangue、lean coal    Low quality soft coal、coal gangue、lean coal
Boilers cylindrical central height level    mm    ****0    ****0    ****0
Boiler width(distance between columns)    mm    ***0    ***0    ***0
Boiler depth(distance between columns)    mm    ****0    ****0    ****0
Boiler cylinder    mm    φ***0×*0    φ***0×*0    φ***0×*0
Number of separators    1    2    2
Type of separators    Heat isolating cyclone    Heat isolating cyclone    Steam cooled cyclone
Type of feed back device    
Non mechanic    Non mechanic    Non mechanic
Type of cinders cooling device    
Roller type water cooling    Roller type water cooling    Roller type water cooling
lgnition mode    
lgnition below water cooled airbed    lgnition below water cooled airbed    lgnition below water cooled airbed
Super heater temperature regulating mode    
Nontontact afte mperator    Nontontact afte mperator    Cooling by water spray

 
2) The simple introduction of **0MW class Circulating Fluidized Bed (CFB) Boiler
• Main steam flow:**0~**0t/h
• Main steam outlet temperature/pressure:**0℃/9.*1~*2.8MPa.g 
• Feed water temperature:**0~**2℃
Technical features:circulating fluidized bed firing, M-type arrang- ement, single furnace, without external bed heat exchanger, single flue duct in the tail, cyclone separator, coal and limestone feeding at front wall, bell-type air cap, upon -bed ignition, roller ash cooler, etc. 
Boiler advantages:extensive fuel adaptability range ( applicable for firing petroleum coke, biomass fuel such as bark, widely used in chemical and paper making industries ), high efficiency of in-boiler desulphurization, low capital and operation cost, low NOx emission, high combustion efficiency, excellent regulation features for steam temperature, simple system configuration, high load regulation ratio, comprehensive utilization of ash and slag. 

3) Design standard and selection scheme of main and auxiliary equipment of boiler island 



The scope of supply for each unit is as follows (taking CFB boiler island project as an example):

S.N.    System    Main equipment

1    Boiler proper    Steam drum, air heater, soot blower, refractory material, cyclone separator, air preheater

2    Coal feeding system    Coal silo, coal feeder, coal chute

3    Limestone system    Limestone silo, rotary feeder, bellows, limestone pipeline

4    Startup bed material system    Bed material silo, bucket elevator, bed material pipeline

5    Air/gas system    Primary air fan, secondary air fan, induced draft fan, high-pressure fluidized air fan, air fan motor, fan silencer, air/gas duct

6    Oil firing system    Start-up burner, high-energy igniter, oil pipe, filter

7    Dedusting system    Bag dust collector

8    Desulphurization system    Absorption tower, process water tank, booster fan, limestone slurry tank, filtrate tank

9    Denitration system    Reactor, pressure-stabilizing trough, ammonia evaporator, ammonia mixer, dilution fan

 

Remark: All the systems and equipment listed in the table include three parts, i.e. mechanical, I&C, and electrical parts.
4) Environmental protection products for power plants 

 
Air Preheater (APH):

1. Adopted highly modular design scheme
2. Designed with perfect air leakage control measures
3. Reliability of equipment is at the leading position in China.
4. Advanced research and development capability for the corrugation of heat exchange element for air preheater
5. Pioneering in the denitration field
6. First-class operation achievements of quad-sector air preheater for CFB boiler


Gas gas heater (GGH):
1. Reliable performance,,low resistance with certain margin of heat exchange
2. Convenient installation and maintenance, reliable operation.
3. Low equipment leakage, varied control means.
4. Various selections of element's corrugation plate, ash clogging resistance, easy cleaning.
5. Long service life.
6. Complete cleaning equipment.
7. Complete whole-set

High-temperature air preheater (HAP):
1. One only set of firing system needed.
2. Compact arrangement, continuous heat exchange.
3. Favorable for keeping furnace temperature and pressure constant .
4. Low temperature fluctuation at heating elements, long life.
5. Favorable for improving quality of processed products.
6. Exhaust emission temperature lower than **0℃ possible.
7.Reliable operation and convenient maintenance.

Welcome to Visit us in Shanghai China, or inquiry more information from my eamil: shawn

国: China
モデル番号: SHX130-4.2/450-AII
离岸价格: 500000 ~ 700000 / Unit ( Negotiable ) Get Latest Price
ロケーション: -
最低注文量の価格: 500000 per Unit
最低注文量: 1
パッケージの詳細: Standard packing
納期: 90 days
供給能力: 100 Unit per Year
支払いタイプ: D/P, D/A, L/C, T/T
製品グループ : Power plant boiler

Send a direct inquiry to this supplier

To:

SHAWN < SINO POWER INDUSTRIAL CO., LTD >

私は知りたい: