あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
AE Series Off Gas Preheating Continuous Feeding Equipment
Next

AE Series Off Gas Preheating Continuous Feeding Equipment

离岸价格

Get Latest Price

( Negotiable )

|

1 Set Minimum Order

国:

China

モデル番号:

-

离岸价格:

( Negotiable ) Get Latest Price

ロケーション:

-

最低注文量の価格:

-

最低注文量:

1 Set

パッケージの詳細:

Standard Export Package

納期:

90 DAYS

供給能力:

5 Set per Year

支払いタイプ:

L/C, T/T

今すぐお問い合わせください
無料会員

連絡先担当者 Ms. Fona

31FL, BLOCK E, WANGZUO INTERNATIONAL BUILDING, NO.1 TANGYAN ROAD, HI-TECH ZONE, XI'AN CHINA, Xian, Shaanxi

今すぐお問い合わせください

タイトルまたは説明

 

AE series preheating continuous feeding equipment is the most advanced, clean, energy saving and environmental protection metallurgy off gas using equipment in nowadays. This is using the off gas from the electric furnace to preheat the raw materials, and avoided the high failure rate, complicated operation, can not charging materials continuously and other weakness from Shaft furnace preheating and preheating bucket and other traditional ways.  This system has been put into production in more than *0 factories in China and several other countries. And had gain marked affects in electricity saving, energy saving, production increasing, pollution reduction, and brought great economic benefits for customers. 

 

AE series preheating continuous feeding equipment has characteristics of continuous feeding, continuous melting, continuous smelting and others, which advantages are: smelting period is short, low power consumption, low noises, low investment cost and etc… 

Comparing with the traditional EAF, the technical index of continuously preheating and feeding EAF process are:

 
  1. Production capacity increases more than *0%.
  2. Smelting cycle is shortened by ****5 Min.
  3. Save energy of ******0kw.h/t for per ton Steel.
  4. Electrode consumption decreases by 0.**0.8%, Refractory material consumption reduces by 5%.
  5. ****0% reduction of CO2 volume which is released from per ton of Steel; Production site dustiness is less than *0mg/M3.
  6. Dioxin and CO emissions meets relative emission standards, Flue gas and dust are decreased from *7kg/t to *1kg/t.
  7. Fully utilization of waste heat: On the Conveyor section can preheat the materials up to **0 degree Celsius and higher, and add burner in conveyor section that can raise the materials up to **0 degree Celsius. The rear part of the waste heat can be used to generate electricity or heating by steam which is produced by waste heat boiler, the gas from the boiler basically can go into the bag type dust collector directly.  But the traditional electric furnace system off gas must go through the water cooled pipes, air forced cooler and other equipments, it will consume much energy to cool the temperature down and then put the gas into dust collector, so waste the energy from the off gas.
  8. De-duster Fan power reduces *0%.
  9. Noise is fewer than *0 decibels during the electric furnace smelting cycle.
 

With fully considering of customers kinds of actual using status, AE series preheating continuous feeding equipment brings direct economic benefits to customers by lowest failure rate, highest energy saving index, biggest investment return.

       

国: China
モデル番号: -
离岸价格: ( Negotiable ) Get Latest Price
ロケーション: -
最低注文量の価格: -
最低注文量: 1 Set
パッケージの詳細: Standard Export Package
納期: 90 DAYS
供給能力: 5 Set per Year
支払いタイプ: L/C, T/T
製品グループ : Preheating Continuous Feeding Equipment

Send a direct inquiry to this supplier

To:

Ms. Fona < Xian Abundance Electric Technology Co., Ltd >

私は知りたい: