离岸价格
Get Latest Price( Negotiable )
|1 Piece Minimum Order
国:
Taiwan
モデル番号:
Fire Prevent
离岸价格:
( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
-
最低注文量:
1 Piece
パッケージの詳細:
-
納期:
-
供給能力:
-
支払いタイプ:
T/T
製品グループ :
-
連絡先担当者 Mr. David
No.7, Ln. 301, Cyonglin S. Rd., Sinjhuang Dist, New Taipei City
reach fire prevention zone while fire occurs in the
first place
Storeys inside the building are seperated into many fireproofing
zone, every zone is an independent zoning, when the fire takes
place in the building, the fire rescue comes first, if the fire
system is unable to bring overall effect, then the fire door will
close automatically while receiving an authorized signal from
fire-fighting system in order to limit an expanding damage and
prevent the building from causing an enormous harm because
of spreading by a large scale.
In the rule of building technology:
The measure area of total floor of the building exceeds***0
square meter should build a fire prevention construction and
equipments, fire equipments should also have heat block
function for over one hour time to hinder the heat (*0A)
Size type:
Unit |
W |
H |
Minimum |
***0(d) |
***0(h) |
Maximum |
***0(b) |
***0(f) |
W= Door Leaf Width
H= Door Leaf Height
DW= Rail Width
DH= Rail Height
Calculation:
d=b**0%
c=(a-b)+d h=f**5%
g=(e-f)+h
国: | Taiwan |
モデル番号: | Fire Prevent |
离岸价格: | ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | 1 Piece |
パッケージの詳細: | - |
納期: | - |
供給能力: | - |
支払いタイプ: | T/T |
製品グループ : | - |