离岸价格
Get Latest Price|
500 Minimum Order
国:
China
モデル番号:
YL-23140
离岸价格:
ロケーション:
Sqm
最低注文量の価格:
-
最低注文量:
500
パッケージの詳細:
-
納期:
1-2weeks
供給能力:
500
支払いタイプ:
-
製品グループ :
連絡先担当者 Tyron
Donggang Road, Shijiazhuang, Hebei
The basic
requirements:
1.The base for
the pavement must be clean, dry, smooth and no cracks.
2.The concrete ground is supposed to have low moisture content
less than 2.5% and the gypsum ground should be less than
0.5%.
3.Error of 2 meter ruler on floor surface should within 3mm.
Besides, wooden floor board, compound wood floor, tile floor,
marble floor and terrazzo floor which could arrive the flatness
requirement can also be paved.
Installation
instruction:
The ground should be cleaned before
installation, unfolded the floor tiles should be on the ground
more than *4 hours in advance and the local temperature should
not below *5°C. Leave 5cm more on each end when cutting.
1.Movable assemblage The pieces of flooring are cemented together
with the special single-sided adhesive tape provided by the
manufacturer, but the flooring in a whole would not adhere to the
ground in order to facilitate the moving in the future.
2.Partial fasted cementation: Starting from the borderline of the
flooring ,paint glue for cementation inward for *0cm.Or use the
double-sided tape provided by the manufacturer for bonding.
3.Full-glue cementation: Cover the whole ground under the
flooring with glue for cementation.(Basketball, tennis courts
would be preferable to use the full-glue cementation, otherwise
it will affect the rebound when the ball drop to the
ground)
国: | China |
モデル番号: | YL-23140 |
离岸价格: | Get Latest Price |
ロケーション: | Sqm |
最低注文量の価格: | - |
最低注文量: | 500 |
パッケージの詳細: | - |
納期: | 1-2weeks |
供給能力: | 500 |
支払いタイプ: | - |
製品グループ : | Badminton Flooring |