离岸价格
Get Latest Price1.9 ~ 2.9 / Kilogram ( Negotiable )
|100 Kilogram Minimum Order
国:
China
モデル番号:
XUNDA T600
离岸价格:
1.9 ~ 2.9 / Kilogram ( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
1.9 per Kilogram
最低注文量:
100 Kilogram
パッケージの詳細:
400*400*420
納期:
7days after received the deposite
供給能力:
500 Ton per Month
支払いタイプ:
T/T, L/C
製品グループ :
連絡先担当者 Mr. Spark
Chenguang Road, No. 1, Rencheng Industry District, Jining, Shandong
bitumen
Material Construction joint sealant anti corrosion tape
The Xunda T6*0 is a cold applied coating system designed for the corrosion protection
water, oil gas underground or aboveground pipelines ,electrolysis on below grade metal substrate and waterproofing for the basement, roof ,bridge etc. The T6*0 consists of a polyethylene backing laminated with rubberized bitumen .Xunda liquid adhesive can be used as primers for this system. It provides a strong cohesive bond to the primed steel surface.
The system can be applied by hand or with a wrapping machine.
l Excellent resistance to soil stress
l Excellent resistance to vapor transmission.
l Excellent resistance to cathodic disbondment.
l Good conformability and consistent uniform thickness.
l Waterproof for the basement, bridges ,roof etc.
l Compatible with substrate of steel, ductile iron, FBE,PE, Plastic Pipe.
l Meets ASTM D ***0 ,EN ****8 and other international standard.
We manufacture polyethylene coating by utilizing butyl based elastomeric adhesives, Polyethylene films and liquid adhesives for corrosion protection of steel pipes.
Our company provides corrosion protection with the inherent chemicals of polyethylene and butyl adhesive for water resistance and oxygen penetration. Oxygen and Water are prevented from reaching the metal substrate. They are the necessary and sufficient conditions for corrosion.
We manufacture conventional and special polyethylene, polypropylene
and polymeric alloy and coating systems for pipe corrosion
protection. We manufacture PE coating systems for the applications
of new pipe construction, rehabilitation and reconditioning. Our
products are ISO***1 approved and are in accordance with other good
manufacturing and technical standards and norms in the energy and
pipeline industry. Coating systems have a broad range of
temperature and shearing resistant properties to meet the
requirements of pipeline end-users.
1.Plastic bag inside Export cartons outside to be fixed with 4 nylon straps
2.Strong enough to be transportable & to avoid deformation
3. We can do as your design
Shipping:
By sea from Qingdao , China
Shipping :
Container Specification :
Container Specification | Length*Width*High(m) | Weight (Ton) | Volume (m²) |
*0GP |
Inside: 5.**8×2.**2×2.**5 Outside: 6.**8×2.**8×2.**1 |
*7.5 | ****6 |
*0GP |
Inside: *2.**2×2.**2×2.**5 Outside: *2.**2×2.**8×2.**1 |
*2 | *4 |
*0HQ |
Inside: *2.**2×2.**2×2.**5 Outside: *2.**2×2.**8×2.**1 |
*2 | *8 |
*5HQ |
Inside : *3.**6×2.**2×2.**8 Outside: *3.**6×2.**8×2.**6 |
*9 |
*8 |
1) Steel pipe pretreatment1.1 Keeping the pipe external surface clean and dry.Remove the dust, oil, welding slag, burrs, grease and dirt on pipe surface.1.2 Pipe surface prepared up-to a level of Sa 2 or 2 ½ or St 2/st by sand blasting. 1.3 After the precleaning operations, the pipe surface not smoothwhich may sharp the pipe coating should be burnished , the abrasive dust attached on the pipe surface should also be cleaned clearly.1.4 If flash rusting occurs, the surfaces must be re-cleaned by blasting as above. 2) Coating &Wrapping application
2.1 Coating &wrapping application consist of primer application, inner tape coating ,outer tape coating .2.2 weather condition 2.2.1 When the wind&sand was strongly, when the sand and dust covered on the surface of pipe, primer tape etc., should not be brushing primer and wrapping the tape if there is no reliabl preventive measures.
2.2.2 When air humidity is greater than *0%,or when the pipe surface is wet from any precipitation, should not be brushing primer and wrapping tape.
3) Brushing primer3.1 The brushing time should be control within 6 hours between the pipe surface treatment and brush primerDuring brush primer, pipe surface should be free from damp
and pollution. If the
pipe surface rust return, should be re-pre-cleaned.
3.2 The primer should be mixed evenly in the container before brushing.3.3 The primer should be applied uniformly, without any sags, floods, runs, drips,
bare spot and over spray, 3.4 After the primer dried, then wrapping the tape(It usually takes 3to 5 minutes.).3.5 Consumption:machine applicationapprox. 0,1 litre/m²
hand applicationapprox. 0,2 litre/m² 4) Wrap tape application4.1 Wrap tape application consists of hand application and machine application.4.2 The tape applied temperature must be above 5 degrees,the coating construction temperature shall be more than *5 degrees as better .4.3 The tape shall be spirally applied ,minimum overlap shall not be less than *0%.4.4 When a new roll of tape started ,the ends shall be located to ensure the continuity of wrap tape using the
same method of application.4.5 Outer tape applied method is the same as above.
5.CutbacksCutbacks shall be a minimum 6inches(**0mm) from the ends of each pipe.The cutbacks may be tapered or straight edge for the total thickness of the coating.
Skype:nancysong7
whatsapp:**************4
**************5
wechat(QQ):********3
国: | China |
モデル番号: | XUNDA T600 |
离岸价格: | 1.9 ~ 2.9 / Kilogram ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 1.9 per Kilogram |
最低注文量: | 100 Kilogram |
パッケージの詳細: | 400*400*420 |
納期: | 7days after received the deposite |
供給能力: | 500 Ton per Month |
支払いタイプ: | T/T, L/C |
製品グループ : | Bitumen |