离岸价格
Get Latest Price( Negotiable )
|1 Piece Minimum Order
国:
China
モデル番号:
-
离岸价格:
( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
-
最低注文量:
1 Piece
パッケージの詳細:
Exporting Packing.
納期:
materials deliver within 10 days after receiving t
供給能力:
-
支払いタイプ:
T/T, L/C, Western Union
製品グループ :
-
連絡先担当者 suzy
Dongying, Shandong
Cementing Plug: when the drilling fluid make the
bottom plug move into the end, raised plum flower petal of the
bottom plug’s lower end engaging with the hollow plum flower petal
of float collar’s upper end. At the same time, the pressure rise,
when reach the definite pressure, the burst disk in the bottom plug
crush, the passageway open, and the pump pressure descent, at this
time can cementing. After cementing, pumping into the top plug to
clean cement slurry on the inner wall, the raised plum flower petal
of the top plug engaging with the hollow plum flower petal of the
bottom plug.
suitable casing |
cementing plug |
|||||
top plug |
bottom plug |
plum flower petal or not |
suitable temperture |
|||
size |
D mm(inch) |
size |
D mm(inch) |
|||
7? |
PGT7 |
Φ**0 |
PGB7 |
Φ**0 |
yes |
**0°C |
**5/8? |
PGT**5 |
Φ**2 |
JS**5 |
Φ**2 |
yes |
**0°C |
***3/8? |
GT**9 |
Φ**5 |
PGB**9 |
Φ**5 |
yes |
**0°C |
国: | China |
モデル番号: | - |
离岸价格: | ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | 1 Piece |
パッケージの詳細: | Exporting Packing. |
納期: | materials deliver within 10 days after receiving t |
供給能力: | - |
支払いタイプ: | T/T, L/C, Western Union |
製品グループ : | - |