离岸价格
Get Latest Price48576 ~ 308823 USD / Set
|1 Set Minimum Order
国:
China
モデル番号:
Model Number: LM0806
离岸价格:
48576 ~ 308823 USD / Set Get Latest Price
ロケーション:
Chaoyang, China
最低注文量の価格:
48576 per Set
最低注文量:
1 Set
パッケージの詳細:
Vertical mill packed in PP material foam outside or wooden box outside or customized.
納期:
15-30 Days
供給能力:
5 Set per Month
支払いタイプ:
Other, Western Union, L/C, T/T
製品グループ :
連絡先担当者 Becky
Chaoyang, Liaoning
Application and
Description:
According to different applications, there
are three types of vertical mill: vertical
coal mill,
vertical slag mill and
vertical cement mill.Vertical mill uses or adopts
hydraulic pressure systembetween the
materials onthe roller and disk to achieve the purpose of
grinding.
Because of its high
efficiency, energy
saving andstable capacity and
yield, it
iswidely used in cement, electric
power, metallurgy, chemical industry, metal and nonmetal
mines, and other
industries.
Vertical mill can be used for processingnon flammable and explosive
materials, with
Mohs hardness below grade 8 and moisture less than *0%. Such
asfeldspar, calcite, talc, barite,
fluorite, rare earth, bentonite, marble, limestone, bauxite,
manganese ore, phosphate ore, iron oxide red, quartz sand, cement
clinker, activated carbon, clay, coal
gangue, gypsum,
silicon,slag,manganese ore,
potassium feldspar.
Vertical
millinghas
a high
efficiency. It can
reduce ****0%energy
cost compared with ball
mill, and can dry *0%moistureof
materials.The
fineness of product is adjustable. And the size is
uniform. It has
simple operation,small footprint and convenient maintenance. It has
low noisy and little dust when working. As the development of
vertical mill, it is also used in medical and
food.
Working
Principle:
The grinding plate of vertical mill is driven
by the motor through
reducer. Material
falls to the center of millstone and then move towards edge under
the centrifugal force. Meanwhile it is rolled by roller. After
crushing, material overflow from the edge, then it is transfered to
the high efficient separator by hot air from nozzle ring. The
bigger materials transmitted back to grinding and the qualified
materials will be collected by the dust collecting system. The big
materials that is not carried and metal parts entering accidentally
will be ground through the external circulation of
bucket.
Advantages in Technology and
Performance:
1.Simple process,
compactstructure
and small construction
area. Itcovers an
areaabout *0% of ball
mill. The building space is about
*0%of ball millandcan be
installed open air. Thatdirectly
reduceinvestment. And the vertical
millhas it own separator and does not need
additional separator and elevator. Exit dust gas can be
directly collected
by bagdust collector or electric dust
collector without
air pollution.
2.Forthe material layer grinding
principle,
vertical mill reduce *0%**0% energy consumption compared with ball
mill. And its
electric power consumption is about *0%~*0% of ball
mill.With the increase of
materialsmoisture,electricity saving
effect is more obvious.Vertical millhas no
steel ball and impact liner inside,
so the noise isverysmall,lowerthanball mill
about*0 ~ *5dB.in addition, for using full closed
system, vertical mill can work under the pressure without air
pollution.
3.Equipped with
auto-control
system, our vertical
mill can be long-distance controlled
conveniently. By ways ofcheckingthe oil
cylinder and
turning the active arm,
the roll sleeve and liner can
be easily renewed,which
canreduce the loss
ofusers.
4.Theproducts ground by our vertical mill has a
stablechemicalcomponent
and uniform size,which be
good for calcine.
Materials invertical millremain only
2 ~ 3min when
it is processed (which will last*5~*0min in
ball mill), so its chemicalcomponent and
fineness can quickly be measured and
corrected.
5.There is no direct contact between roller and
grinding plate, so the abrasion is very
small.The unit product metal consumption
is generally 5 ~ *0g/t.
Maintenance &
Attention:
1.The
operatorof
vertical mill should be fixed andhave a
certainknowledge
about the machine.Before
the installation
of vertical
mill, the
operator mustbe
trainedto
understandits workingprinciple and the operating
procedures.
2.In order to make vertical
mill service for a long time, the
"equipment maintenance and safety operation
system" shouldbemade. It is
necessary to maintain tool, lubricate and other relative
parts. Regularly
checking the lubrication
conditions and
adding lubricatinggrease according tothe
instructions.
3.Feeding materials must
not contain large pieces
ofiron slag anddebris.
Itwill not only increase
theabrasionof grinding
parts,but caused the
blocking of
millaffecting the mill output and continuous
operation. Therefore, themetal
detectors should beinstalled.
4.vertical
mill should be check and maintenance after using
a period time. Meanwhile,
roller sleeve, mill
liner and
scraperplat
should be repaired and
replaced. Before and
afterworking,connecting bolts and nuts should
beexamine,
to see whetherit is loose, lubricant is
enough.
5.The rolling bearings in roller sleeve must be
cleaned when changingthe roller sleeve and the
grindingplate
liner. Damaged parts should be
replaced in time, andrefueling tools
canuse manually pump and grease
gun.
6.If you want to turn down the vertical mill,
please stop feeding materials first. Stop the main motor and
analyzer motor only after all materials in mill discharged out,
about one minute after stop feeding.Then stop the fan
motor at last,in order
toblow powder all
out.
国: | China |
モデル番号: | Model Number: LM0806 |
离岸价格: | 48576 ~ 308823 / Set Get Latest Price |
ロケーション: | Chaoyang, China |
最低注文量の価格: | 48576 per Set |
最低注文量: | 1 Set |
パッケージの詳細: | Vertical mill packed in PP material foam outside or wooden box outside or customized. |
納期: | 15-30 Days |
供給能力: | 5 Set per Month |
支払いタイプ: | Other, Western Union, L/C, T/T |
製品グループ : | mill |