离岸价格
Get Latest Price1 ~ 99 USD / Set
|1 Set Minimum Order
国:
China
モデル番号:
HZ-005
离岸价格:
1 ~ 99 USD / Set Get Latest Price
ロケーション:
-
最低注文量の価格:
1 per Set
最低注文量:
1 Set
パッケージの詳細:
Export packing
納期:
at least 45 days
供給能力:
200 Set per Month
支払いタイプ:
T/T, L/C
製品グループ :
連絡先担当者 Mr. Leon
No. 77, Daxiang Village, Yangzhuang Village Committee) Zouqu Industrial Area, Wujin Dist., Changzhou, Jiangsu
1:Overview
This Pre-stressed Concrete Spun Pile(Pole) Steel Mould is used
for electronic concrete pole making. Its mainly manufacture
technology is longitudinal tension by steel wires. Then it can
squeeze out the excess water in the concrete under the centrifugal
force. Thus, it can greatly improve the concrete density and
strength.
In order to form the concrete more quickly to meet the design
strength of more than *0%, steam curing can be carried out so as to
shorten the mould-releasing cycle.
Our factory products two categories of Pre-stressed concrete pole
steel moulds, DMZ&DMD. The Pre-stressed Electric Poles by this
series equipment comply with the China Standard JC/T*******1.
2:Working Principle
2.1. The steel mould should work together with pole spinning
machine. The steel mould should be placed on the spinning machine
smoothly.
2.2. Put the mixed slurry into the mould and rotate in different
directions under the motor driven.
2.3. In this process, the redundant water in the concrete is
released by the force of centrifugal, and the concrete is dense and
high strength. And then, the pole forms around the inner wall of
the pole mould.
4:Features
4.1. Welding technology, this enhances the smooth finish of the
mould wall, and eliminates the uneven traces of rivet holes. So the
concrete poles appearance will be improved significantly.
4.2. The cylinder is changed to U-type longitudinal stiffeners
which can greatly increase the stiffness and flexural strength of
the steel mould,
4.3. Install the slot with rubber sealing strip, in order to
prevent leakage to ensure quality.
国: | China |
モデル番号: | HZ-005 |
离岸价格: | 1 ~ 99 / Set Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 1 per Set |
最低注文量: | 1 Set |
パッケージの詳細: | Export packing |
納期: | at least 45 days |
供給能力: | 200 Set per Month |
支払いタイプ: | T/T, L/C |
製品グループ : | concrete spun pile production line |