离岸价格
Get Latest Price|
1 Minimum Order
国:
China
モデル番号:
CP-GTF
离岸价格:
ロケーション:
-
最低注文量の価格:
-
最低注文量:
1
パッケージの詳細:
pallet
納期:
1-2 DAYS
供給能力:
5000 Piece per Week
支払いタイプ:
PayPal, T/T
製品グループ :
-
連絡先担当者 Eline
Xiamen, Fujian
Introduction:
Our spiral pile is dry method not
using concrete.
It is possible to work on the soft ground without excavating work and removal og surplus soil.
Constructing dulation and cost cab be reduced due to dry methode with all-weather work.
It also contributes to the vitalization of construction business
for winter time.
Features:
1.reduce installation cost at worksite
2.deline labor cost
3.eco-friendly methord without concrete foundation
4.without excavating,no surplus soil
5.pulled out from soil easily
6.used for different places,even temporary structures
7.design avoiding underground utilities
Applied site:
1.solar farm
2.solar ground mount structure
3.wind power generation foundation
4.highway
5.park
6.street light
7.traffic light
8.temporary structure/house
9.wooden house
*0.Structure
base of electric power
*1.Transmitting
station foundation
*2.Vinyl
greenhouse base
*3.Anti-typhoon measure anchor
国: | China |
モデル番号: | CP-GTF |
离岸价格: | Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | 1 |
パッケージの詳細: | pallet |
納期: | 1-2 DAYS |
供給能力: | 5000 Piece per Week |
支払いタイプ: | PayPal, T/T |
製品グループ : | - |