离岸价格
Get Latest Price760 / Metric Ton
|15 Metric Ton Minimum Order
国:
China
モデル番号:
82B
离岸价格:
760 / Metric Ton Get Latest Price
ロケーション:
-
最低注文量の価格:
760 per Metric Ton
最低注文量:
15 Metric Ton
パッケージの詳細:
waterproof cloth out side, and eight steel bands inside, with wooden Pallet
納期:
within 35-45 days after receiving T/T advance or L
供給能力:
10000 Metric Ton per Month
支払いタイプ:
L/C, T/T
製品グループ :
dia 6.0mm**7.8mm pc strand 1) 1*2, 1*3 ,1*7wire 2) Dia. 6.***4.0mm;6.****5.*5mm;9.***7.*0mm 3) low relaxation dia 6.0mm**7.8mm pc strand 1*2 wire P.C.strand Nor.Dia.(mm):6.0;8.0;*0.0;*2.0;*4.0 1*3 wire P.C.strand Nor.Dia.(mm):6.*5;8.*0;*0.*5;*2.*0;*5.*5 1*7 wire P.C.strand Nor.Dia.(mm):9.0;*2.0;*2.7;*5.0;*5.*0;*5.*4;*5.*0;*7.*0 Standard: GB/T ***4,GB/T***3(China);ASTM A**6,ASTMA**1(USA);BS ***6(UN);JIS G***6(Japan);AS/NZS ***2(Australia);NBR****3(Brazil);EN****8(Europe);ISO**4 The steel embedded in pre-stressed concrete structure will be pretensioned prior to load application and thus made to pre-stress the concrete so as to offset or reduce the tensile stress produced by loading, then to improve the crack resistance and rigidity of structural members accordingly as well as to reduce the width of crack and use the high-strength steel and concrete in an effective way and so then save steel and cut down dead weight. The steel wire or cable is made,Friction losses small,No secondary grouting,Construction is more convenient Used for:Big span reinforced concrete structure,Anchorage foundation.
国: | China |
モデル番号: | 82B |
离岸价格: | 760 / Metric Ton Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 760 per Metric Ton |
最低注文量: | 15 Metric Ton |
パッケージの詳細: | waterproof cloth out side, and eight steel bands inside, with wooden Pallet |
納期: | within 35-45 days after receiving T/T advance or L |
供給能力: | 10000 Metric Ton per Month |
支払いタイプ: | L/C, T/T |
製品グループ : | Steel Strand |