あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
Book call on your favorite time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Amazon Services

Omeroglu Metallurgy Co.Ltd.

T.Ziyaeddin Cd.No:31,Konya,Konya,Turkey

查看电话号码

無料会員

Differential

Turkey

-

2 ~ 8 / Kilogram ( Negotiable ) Get Latest Price

-

2 per Kilogram

10000 Kilogram

wooden box

Max. 30 days after payment recieved

60000 Kilogram per Month

L/C, T/T

Motor parts

今すぐお問い合わせください

製品仕様

Brand Name : Custom Manufactured Type : - OE NO. : - Car Make : - Size : -

タイトルまたは説明

Omeroglu Metalurji have involved iron, ductile (nodular) iron and steel casting business since 1991.Our company owner's exprience on casting business is for more then 40 years.Our product are agricultural equipment parts, automotive parts, valves, elevator system and machinery parts and etc.We are casting agricultural machinery parts such as gearbox bodies, frontal covers, rear covers, rods, gears, valve bodies, bonnets, flanges, stems for world renowned Turkish companies.Our casting capacity per unit is between 1 kg to 5 tons.We want to help you for your machine parts and other casting products with our quality and experience. Our manufacturing schedule is here below, Manufacturing Schedule; Our typical manufacturing schedule starts with the recieving order from our customers. According to the order , it requires to prepare the raw materials such as pig iron, scrap steel etc. And also requires manufactured materials such as cores. So pattern and core boxes which has been sent from our customers are prepped for the production. Core room starts working first, and gets cores ready for molds which are being made.Meanwhile mold halves ( upper and lower ) are made and placed to the assembly area.At the assembly area, molds are flow coated and cores are set in place. The mold is then closed up for pouring. After molds are staged on line, melted raw materials with our electircal induction furnace brougth to the molds and pouring process starts. Once poured, the molds are allowed to cool before next being sent to the shakeout. At the shakeout, the castings are separated from the sand mold. The sand is sent to a reclamation system so that it can be reused in the molding process.After shakeout is done, castings are sent to the cleaning room where they are prepared for costumers specifications. Processing in the cleaning room includes shot blasting, cut-off, welding, heat treating and inspection. 1-Receving order

2-Schedule

    a)Core Making

       a-1)Molding

          a-1-a)Flow Coat

          a-1-b)Assembly

    b)Melting

       b-1)Spectro

3)Pouring and Shakeout

4)Cleaning room

    a)Shot-blast

    b)Cut-off

    c)Welding

    d)Grinding

    e)Inspection

    f)Heat treatment

Image result for differential

お問い合わせ

連絡先担当者:Mr. Kadir

会社:Omeroglu Metallurgy Co.Ltd.

住所:T.Ziyaeddin Cd.No:31, Konya, Konya, Turkey,42250

To,

Mr. Kadir < Omeroglu Metallurgy Co.Ltd. >
私は知りたい:

他のサプライヤーからのより多くの製品

4334002001 DIFFERENTIAL GEAR SET 4334002001 DIFFERENTIAL
MERCEDES-BENZ HL6 DIFFERENTIALS UNITS MERCEDES-BENZ HL6
DIFFERENTIAL SPIDER GEAR KIT DIFFERENTIAL SPIDER GEAR
Differential TOYOTA 8:39 Differential TOYOTA 8:39
Sun, Planetary and Ring Gears for Mercedes Sun Planetary and Ring
Final Drive and Differential Assy Final Drive and
NPR 4HE1 DIFFERENTIAL SPIDER SET (INNER19 OUTER20) FOR ISUZU T-598-PT NPR 4HE1 DIFFERENTIAL
DIFFERENTIAL CASE SHORT DIFFERENTIAL CASE SHORT
differential case ford differential case ford
Auto Transmission Differential Cross Shaft Spider Auto Transmission
Differential Differential
cast iron differential housing, differential box cast iron differential
Differential Differential
Truck Differential Spider, Cross Joint Assy of JAC Auto Truck Part Truck Differential Spider
Mitsubishi FUSO 4D30/ CANTER PS100 differential assembly in auto transmission Mitsubishi FUSO 4D30/
differaintial spare parts differaintial spare parts