あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
DZL SERIES STEAM BOILER DZL SERIES STEAM BOILER
Next

DZL SERIES STEAM BOILER

离岸价格

Get Latest Price

20000 ~ 300000 / Set

|

1 Set Minimum Order

国:

China

モデル番号:

-

离岸价格:

20000 ~ 300000 / Set Get Latest Price

ロケーション:

-

最低注文量の価格:

20000 per Set

最低注文量:

1 Set

パッケージの詳細:

Bulk

納期:

Within 35-45 days

供給能力:

-

支払いタイプ:

T/T, L/C

製品グループ :

-

今すぐお問い合わせください
無料会員

連絡先担当者 Sophia

Taian , Shandong

今すぐお問い合わせください

製品仕様

  • Color:Customer Requirement

タイトルまたは説明

1. Efficient heat transfer component      threaded smoke tube is adapted, after being coupled with reasonable flow rate of flue gas, there can be hardly any dust stratification during running, thus making thermal efficiency of boilers *-    8 percent than national standard.

 2. Arched tube plate-threaded smoke tube turns the shell from quasi-rigid body to quasi-    elastic body, after being coupled with reasonable winged flue, defects of high temperature tube plate cracking of traditional smoke and fire tubes can be fully avoided.

 3. Bottom of the shell is free from flame radiation, so the possibility of bulge at the bottom of shell is    eradicated.

 4. Reasonable water circulation loop and unique back water injection 

 device increase the water speed in ascending tube and avoid explosion of water wall tube.

 5. Adoption of inertial isolation of smoke and dust within furnace, after being coupled with effective m  ulti-tube dust separator, dust emission concentration of boiler can meet demands of Class 1 region.

 6. Reasonable boiler structure can support its own weight without the aid of steel frame.

 7. The use of energy-  conserving and intensely radiation arch can strengthen the combustion; strong adaptability of coal ty  pes can ensure the stable and sufficient combustion of fuels.

 8. The adoption of high-standard and high-  quality auxiliaries, accessories and automatic control equipment guarantees safety and steady oper  ation of the boiler and reduces labor intensity of firemen.

 9. The structure is compact, the boiler can be fixed up in single layer, and the floor area is small, so c  onstruction costs of boiler room is low, and the capacity-  enlarging effect on the basis of original boiler room is especially obvious.

 

国: China
モデル番号: -
离岸价格: 20000 ~ 300000 / Set Get Latest Price
ロケーション: -
最低注文量の価格: 20000 per Set
最低注文量: 1 Set
パッケージの詳細: Bulk
納期: Within 35-45 days
供給能力: -
支払いタイプ: T/T, L/C
製品グループ : -

Send a direct inquiry to this supplier

To:

Sophia < SHANKOU BOILER GROUP >

私は知りたい: