タイトルまたは説明
1Efficient heat transfer component-threaded smoke tube is adopted
after being couoled with reasonable dlow rate of flue gas,there can
be hardly any dust stratifaction during running,that making thermal
efficiency of boilers **8 oercent high than national standard.
2arched tube plate-threaded smoke tube turns the shell from
quasi-rigid body to quasi-elastic body.after being coupled with
reasonable winged flue,defects of high temperature tube plate
cracking of traditional smoke and fire tubes can be fully
avoided
3Bottom of the shell is free from flame radiation,so the
possibility of bulge at the bottom of shell is eradicated.
4 Reasonable water circulation loop and unique backwater injection
device increase the water speed in assending tube and explosion of
water wall tube.
5Adoption of inertial isolation of smoke and dust within
furnace,aftering being coupled with effective multi-tube dust
separator,dust emissio n concentration of boiler can meet demands
of class 1 region.
6Reasonable boiler structure can support its own weight without the
aid of steel frame.
7The use of energy-conserving and intensely radiating arch can
strength the combustion,strong adaptability of coal types can
ensure the stable and sufficient combustion of fuels.
8The adoption of high-standard and high-quality
auxiliaries,accessories and automatic control equipment guarantees
safety and steady operation.
9The structure is compact ,the boiler can be fixed up in single
layer,and the floor area is small,so construction cost of boiler
room is low,and the capacity-enlarging effect on the basis of
origial boiler room is esspically obvious.
国: |
China |
モデル番号: |
DZL
|
离岸价格: |
20000 ~ 130000 / Set ( Negotiable ) (交渉可能)
Get Latest Price
|
ロケーション: |
- |
最低注文量の価格: |
20000 per Set |
最低注文量: |
1 Set |
パッケージの詳細: |
standarding packing |
納期: |
after payment 20 days |
供給能力: |
10 Set per Month |
支払いタイプ: |
D/P, D/A, L/C, T/T |
製品グループ : |
- |