あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
gold dusts/nuggets, copper cathodes, tantalite
Next

gold dusts/nuggets, copper cathodes, tantalite

离岸价格

Get Latest Price

|

- Minimum Order

国:

Congo (DRC)

モデル番号:

mkm-1930

离岸价格:

Get Latest Price

ロケーション:

Zambia,Tanzania, Congo

最低注文量の価格:

-

最低注文量:

-

パッケージの詳細:

-

納期:

-

供給能力:

350 kgs gold

支払いタイプ:

-

製品グループ :

-

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. Luck

347 Kanfwankumba, Lubumbashi, Katanga, DR Congo

今すぐお問い合わせください

製品仕様

タイトルまたは説明

gold dusts/nuggets from *2% upwards, copper cathodes *9.*9% , tantalite *5% upwards all products from the DR Congo gold dusts/nuggets normaly parkrd in a wooden or metal boxes. copper cathodes . Product: Non LME Copper Cathodes (Electrolytic Grade A ) Min. Cu-purity: *9.*9% minimum Size: **4mm X **4mm X *2mm (appr.)(*6” X *6” X 0.5) Weight of each sheet: **5kgs +/- 2% Packing: palletized banded by aluminium bands Net weight of each pallet: 2M/T +/- 2% Min. weight of each container: *0 M/T approx. Gross weight of each container: *2.2 M/T approx. tantalite parked in bags of 1 MT to 2 MT. Miniere de Kinsenda et Musoshi, the fully-integrated exploration, mining, trading and Investment Company, is pleased to announce an update on its activities in the Democratic Republic of the Congo ('DRC'). The Company has acquired the remaining *5% interest in Congo Resources Venture Luba increased its resource estimates on the M*9, M*1 and Komboluba concession areas in the Katanda Province and raised its production targets for cobalt and copper cathode to *5, **0 tonnes and **0, **0 tonnes per annum respectively. The remaining *5% of reserves has been acquired following the purchase of Muntu Metal Trading Ltd for in cash: The Company acquired the initial in February ***5 following the purchase of Kalangana Metal Factories Ltd. The resources estimated on the M*9, M*1 and Luba concession areas by Gecamines and Union Miniere have now been quantified at 2.5 million tonnes of copper and **0, **0 tonnes of cobalt, contained in *0 million tonnes of ore. These estimates have been extracted from further analysis of the original data, which was based on exploration that pre-dates modern resource reporting standards, as well as new data obtained from the aforementioned sources, covering the M*1 concession. An aeromagnetic and spectrum survey is currently being flown on the M*9 and M*1 concession areas, which will define targets for the drilling programme being conducted to increase the resource estimates and bring them up to Likabashi compliant status. Following continued investment and re-appraisal, the Luba copper processing facility is now being expanded in order to achieve template capacity of **0, **0 tonnes of copper cathode by the end of ***8. The investment programme includes the running of a 6km power line, the upgrading of an electrical substation, the construction of an expatriate *0 house village and leisure facilities to accommodate the Company's increasing staffing requirements, the building of a fully enclosed and covered *0 hectare SX-EW plant and the implementation of an extensive road construction programme. The initial phase of the development of the copper leaching facility at Luba is now complete. It is intended that in the short term the leached solution will be toll treated by a third party, with whom discussions are on-going, to produce LME Grade metal. It is anticipated that the Luba facility will also produce up to *0, **0 tons per annum cobalt cathode from the integrated copper cobalt leach and electro winning circuits. At present the Luba cobalt leach facility produces high value cobalt concentrate in the form of oxides and hydroxides. However, cobalt electro winning facilities are being implemented in parallel with those for copper. In addition, a new DMS plant is being established to help process cobalt ore from Milubacongo and other M*9 cobalt deposits. The Company is also in the process of strengthening its Board and operational team to help facilitate the rapid development of the Company in the whole of DR Congo. Our company *0 Yrs Development Plan 'We are only at the beginning of a comprehensive exploration programme, which we are confident will, over a period of time, confirm a very significant resource base in the highly prospective concession areas in which we have an interest. We will continue to invest in the DRC in the belief that there is further opportunity for a company such as ours, which has spent significant time on the ground developing relationships and delivering on its promises.'

国: Congo (DRC)
モデル番号: mkm-1930
离岸价格: Get Latest Price
ロケーション: Zambia,Tanzania, Congo
最低注文量の価格: -
最低注文量: -
パッケージの詳細: -
納期: -
供給能力: 350 kgs gold
支払いタイプ: -
製品グループ : -

Send a direct inquiry to this supplier

To:

Mr. Luck < Miniere De Kinsenda Et Musoshi SPRL >

私は知りたい: