离岸价格
Get Latest Price3 ~ 15 / Piece
|20 Piece Minimum Order
国:
China
モデル番号:
-
离岸价格:
3 ~ 15 / Piece Get Latest Price
ロケーション:
Shandong,China
最低注文量の価格:
3 per Piece
最低注文量:
20 Piece
パッケージの詳細:
Vacuum packing and carton outside. 8-10pcs/pack or according to customers' requirements
納期:
by air/sea, in 15 days after receiving the payment
供給能力:
20000 Piece per Month
支払いタイプ:
L/C, T/T
製品グループ :
連絡先担当者 Ms. Selina
Xilongjiao Village, Kunlun Town, Zichuan Dist, Zibo, Shandong
**0**6*9 |
**0**0**0 |
**5**0**0 |
**0**4**0 |
**0**6**0 |
**0**0**0 |
**0**0*1 |
**0**5**0 |
**0**5**0 |
(2)
Physical performances:
Cold
Resistivity(*0°C) |
*******0μΩ.cm |
Evaporation
speed |
0.**0.5g/min.cm2Â |
Working
temperature |
Below ***0°C |
Thermal
conductivity
(*0°C/***0°C) |
>**0/*0W/m.k |
Coefficient
of thermal expansion
(***0°C) |
(**6)X***6KÂ |
Flexural
strength(*0°C) |
>**0MPa |
Specification |
According to customers’ size |
Packaging |
Vacuum package |
 (3)
Tehnology standard:
1.Length:L±0.5
2.Width:B*0.1
3.Thickness:H±0.*8
4.Bending
strength:≤0.5mm
5.Undersurface
roughness :≤0.1mm
6.Two sides
nonparallelisn:≤0.2mm
 (4)Using
conditions:
1.working
current:******0A
2.working
voltage:***5V
3. working
temperature:***0 - ***0°C
4.evaporation
rate:0.**0.5g/ minute /cm^2
5. service
life :****5hours
 (5)Properties
of products:
1.Good
thermal performance and good stability.
2.Good
insulativity, Abrasion-resistance
3.Good
processing performance, Precision can reach
0.*1mm
4.Good
chemistry stability,can not reaction with Metal And
acid.
5.Pierce
Infrared and microwave,absorption neutron
6.non-poisonous
 (6)Application:
As melting
aluminum and zinc sulfide, using in vacuum evaporation
technology.Â
In order to
play best capacity of evaporation boat, please operate as
following:
1. Keep two
rows of fixture alignment and keep the surface
smooth.
2. When first
heating for the new boat, please put an aluminium yarn in the
central
groove in order to judge the boat's temperature.
3. The
connection point of Aluminium yarn should be located in 1/3 to 1/2
place of
boat.
4. For the
first heating for new boat, please don't heat quickly, in order to
avoid to
affecting air bleeding.
5. For the
first time,the speed of sending aluminum should at the rate of
*5%
normal speed and increase gradually,And turn down the power in
order to reach to
max area of aluminum liquid.
6. For the
first boat, first heating for *5 minutes will be best. And send
aluminum to
evaporate plating follow the above methods.
7. When each
coil finished evaporating, please stop sending aluminium first.
And
stop the power ****0 seconds later. Two minutes after stop power
and the boat's
color turn to dark red, than stop close vacuum.
国: | China |
モデル番号: | - |
离岸价格: | 3 ~ 15 / Piece Get Latest Price |
ロケーション: | Shandong,China |
最低注文量の価格: | 3 per Piece |
最低注文量: | 20 Piece |
パッケージの詳細: | Vacuum packing and carton outside. 8-10pcs/pack or according to customers' requirements |
納期: | by air/sea, in 15 days after receiving the payment |
供給能力: | 20000 Piece per Month |
支払いタイプ: | L/C, T/T |
製品グループ : | Boron Nitride |