离岸价格
Get Latest Price|
- Minimum Order
国:
Peru
モデル番号:
HDPE
离岸价格:
ロケーション:
-
最低注文量の価格:
-
最低注文量:
-
パッケージの詳細:
-
納期:
-
供給能力:
-
支払いタイプ:
-
製品グループ :
-
Peru
連絡先担当者 Victor Leonardo
Lima region, Lima region
We are able to provide our services in the installation and implementation Recycling Plant integrating proprietary technology with highly qualified staff as well as having a vast experience in the process. Because they are projects involving the participation of our society work with MUNICIPALITIES, AND ALL PRIVATE COMPANIES VENTURE PROJECT.
We have highly qualified staff that provides technical assistance to develop projects and clients to solve their needs. We also offer a strict quality control and logistics offices thus achieving the full satisfaction of each of our clients.
The design and construction of the recycling plant will be the responsibility of engineers in our country, who shall respond to the benefits of social utility and construction costs, as well as to the specifics in the design and layout of machinery. The design engineer must be in a position so that he can give management a preconstruction cost estimates, based on a preliminary design of the plant for the manufacture of the product, so it is possible to base a decision firm. This preliminary analysis of the plant design includes:
- Manufacturing process.
- Selection of process equipment and materials.
- Distribution of plant and considerations regarding the
location.
- Cost of manufacture.
Detailed plant design comprises the following sequence of
steps:
- Location of the plant.
- Collection of meteorological and seismic data.
- Product Design: Characteristics and attributes of the
product.
- Process design: Stages of process, raw materials,
intermediate products, by-products, waste and end
products. Process Flow Diagram.
- Design team: Determine the equipment and machinery needed
to manufacture, depending on the type of product or
products.
- Set the number of units of each type of machine and
equipment needed to manufacture each product depending on the
sales volume.
- Calculate the total space required for the plant,
adding:
• The space required for machinery.
• development of the operator area.
• Area for service to machines.
• Area for ingress and egress of materials.
• Area finished products.
• Personnel Services Area.
• Parking and landscaping.
国: | Peru |
モデル番号: | HDPE |
离岸价格: | Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | - |
パッケージの詳細: | - |
納期: | - |
供給能力: | - |
支払いタイプ: | - |
製品グループ : | - |