离岸价格
Get Latest Price15000 ~ 40000 USD / Piece
|1 Piece Minimum Order
国:
China
モデル番号:
-
离岸价格:
15000 ~ 40000 USD / Piece Get Latest Price
ロケーション:
China
最低注文量の価格:
15000 per Piece
最低注文量:
1 Piece
パッケージの詳細:
plastic film
納期:
20-25 days
供給能力:
100 Piece per Year
支払いタイプ:
-
製品グループ :
連絡先担当者 Mr. Peter
No. 101 ShuangLong Road, Fushan District, Yantai, Shandong
Application
mainly applied in demolishing high-rises. damage building
â–‡ we design long reach excavator boom arm on base of force
analysis, parts drawing generated by CAD, engineer from
Caterpiller company,
â–‡ we have professional digital cutting machine to cut out
plates shape,
â–‡ our welding worker with more than *0years welding
experience.
â–‡ diligent cleaning work before paint
Technical Parameter For Demolition High
Reach
|
|||||||
---|---|---|---|---|---|---|---|
Excavator Operating Weight (Ton) |
*2T
|
*0T
|
*2T
|
*0T
|
*5T
|
*0T
|
*5T
|
Parameter
|
|||||||
Total Length for 3segments (mm)
|
****0
|
****0
|
****0
|
****0
|
****0
|
****0
|
****0
|
Weight(KG)
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
Limitation for Weight of Shear(KG)
|
under**0
|
under***0
|
under***0
|
under***0
|
under***0
|
under***0
|
under***0
|
Overall Height(mm)
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
***0
|
国: | China |
モデル番号: | - |
离岸价格: | 15000 ~ 40000 / Piece Get Latest Price |
ロケーション: | China |
最低注文量の価格: | 15000 per Piece |
最低注文量: | 1 Piece |
パッケージの詳細: | plastic film |
納期: | 20-25 days |
供給能力: | 100 Piece per Year |
支払いタイプ: | - |
製品グループ : | Boom Arm |