あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Hot worked tool steel H13
Next

Hot worked tool steel H13

离岸价格

Get Latest Price

USD ( Negotiable )

|

5 Ton Minimum Order

国:

Hong Kong

モデル番号:

-

离岸价格:

USD ( Negotiable ) Get Latest Price

ロケーション:

china

最低注文量の価格:

-

最低注文量:

5 Ton

パッケージの詳細:

As per requirement

納期:

30-35 days Hot forged, Spheroidizing annealed with

供給能力:

-

支払いタイプ:

-

製品グループ :

-

今すぐお問い合わせください

MILSTEEL

Hong Kong

無料会員

連絡先担当者 Ms. Hilary

Gaylord Commercial Building, 114-118 Lockhart Rd Wan Chai, Hong Kong

今すぐお問い合わせください

製品仕様

タイトルまたは説明

Related specifications

Europe EN 1.***4

Germany DIN X*0CrMoV**1

Great Britain BS ***9 BH*3

USA AISI H*3A

Japan JIS-SKD*1

GB/China 4Cr5MoSiV1

Chemical Analysis

C Mn Si Cr Mo V P S

0.***0.*0 0.**0.5 0.**1.0 4.**5.0 1.**1.3 0.**1.0 ≤0.**5 ≤0.**0

Applications

-General purpose hot worked tool steel used in aluminium extrusion dies, backers and

bolsters, stems and mandrels, die casting dies and forging inserts.

Die Casting

Dies

Dummy Blocks Extrusion Dies Hot

Forging Dies Heading Dies Hot Heavy Shear Blades

Inserts Mandrels Piercing Tools Hot

Plastic Mold

Dies

Punches Hot Swaging Dies Hot

Main feature: High tenacity, plasticity, thermostability and abrasive resistance.

Hardening

Hardening should be done in controlled atmosphere, vacuum or fluidized bed furnace.

Preheat gradually to **0/**0 ℃ then raise to ***0/***0℃, holding for sufficient time to

attain uniformity throughout the tool, air cooling.

Tempering: Tempering should be carried out immediately after air quenching. Heat to **0/**0℃,

holding for one to three hours. Tools benefit from multi-tempering and a minimum of two

tempers is recommended. Care should be taken to ensure tools cooling to room

temperature in between tempers. Also suitable for both bath and gas nitriding.

Conventional Smelt: EF+LF+VD+ESR

Available size

Type

Thickness

mm

Width/Diameter

mm

Length

mm

Block ******0 *******0 ********0

Round

bar

*****0 ********0

Delivery Condition

Hot forged, Spheroidizing annealed with hardness HB******0

atment

Temperature

Range

Cooling/Quenching Notes

Forging ********0° F Slow Do not forge below ***0° F. Anneal after forging.

Annealing ********5° F

Cool slowly at a

rate of *5° F per

hour to a ***0° F.

Protect against surface decarburization using

controlled atmosphere or by pack-annealing. Hold at

temperature for 2 hours.

Stress

Relieving

********0° F

Cool slowly in

furnace to **0° F.

Then in air.

Preheating ********0° F

Preheat time in furnace is ¾ Hr. per inch of thickness.

Heating up to temperature as slow as possible.

Hardening ********0° F

To minimize

distortion, air cool.

For maximum

hardness

diameters greater

than 6􀳦 should be

quenched in oil.

Soak time is *0 minutes per inch of thickness.

Minimum of 1 hour. Allow to cool to ******0° F before

tempering

Tempering In air.

Complete equalization of temperature throughout the

tools is essential for good results. Double temper.

Recommended temperature is ********0° F.

国: Hong Kong
モデル番号: -
离岸价格: ( Negotiable ) Get Latest Price
ロケーション: china
最低注文量の価格: -
最低注文量: 5 Ton
パッケージの詳細: As per requirement
納期: 30-35 days Hot forged, Spheroidizing annealed with
供給能力: -
支払いタイプ: -
製品グループ : -

Send a direct inquiry to this supplier

To:

Ms. Hilary < MILSTEEL >

私は知りたい: