离岸价格
Get Latest Price|
1 Set Minimum Order
国:
China
モデル番号:
QC11Y-8x3200
离岸价格:
ロケーション:
-
最低注文量の価格:
-
最低注文量:
1 Set
パッケージの詳細:
plastic film covered, and fixed by steel rope
納期:
30 working days after deposit
供給能力:
40 Set per Month
支払いタイプ:
T/T
製品グループ :
-
連絡先担当者 Ruth
Nantong, Jiangsu
Steel welded structure, the integrated treatment(VSR,heat
treatment), to eliminate internal stress, have a good rigidity and
stability.
The use of advanced integrated hydraulic system, and good
reliability.
Using three-point rolling guide to eliminate rail gap and improve
quality of shear;electric back gauge, manual fine-tuning, digital
display.
Blade gap with hand wheel adjustment, rapid, accurate and
convenient. Rectangular blade, four blade can be used long service
life. Adjustable shearing angle to reduce the sheet
distortion.
Dumping on the knife used in the structure, easy to blanking, and
can improve accuracy.
Cut with piecewise functions;
Lighting device with a feature prop feeding device(can be another
option to configure).
item name specification unit note
1 Max. Shearing
thickness General
steel plate 8
mm
2 Shearing
width ***0 mm
3 Shear
strength **0
MPa
4 Shearing
angler 1.5
5
Stroke 8~*2
n/min
7 Distance of
uprights ***0 mm
8 Blade
length ***0 mm
9 Table
height **5 mm
*0 Main
motor model Y****0M*4
*1
Pump
model NT*-G*2F
*2 Overall
dimensions length ***0 mm
width ***0 mm
height ***0mm
Delivery time:*0 working days after deposit
Warranty:*4months after delivery
Payment:*0%T/T in advance, *0% before shipment
国: | China |
モデル番号: | QC11Y-8x3200 |
离岸价格: | Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | 1 Set |
パッケージの詳細: | plastic film covered, and fixed by steel rope |
納期: | 30 working days after deposit |
供給能力: | 40 Set per Month |
支払いタイプ: | T/T |
製品グループ : | - |