离岸价格
Get Latest Price( Negotiable )
|1 Set Minimum Order
国:
China
モデル番号:
Launching gantry in span by span
离岸价格:
( Negotiable )Get Latest Price
ロケーション:
P.R.China
最低注文量の価格:
-
最低注文量:
1 Set
パッケージの詳細:
sea worth packing
納期:
6 months
供給能力:
6 Set per Year
支払いタイプ:
L/C, T/T
製品グループ :
連絡先担当者 Mr. Bruce
Dushi Industry Park, Songzhuang Town, Tongzhou District, Beijing, Beijing
The tyre trolley transfers the concrete segment to the rear of the launching gantry. The lifting trolley of the gantry lifts the concrete segment to the assembly position and the steeve hangs up the segment. After assembly, these segments tighten together with stressing wires, and the gantry put the beam on the pier and fulfill the construction of bridge segment. Based on the requirement of our client and the bridge conditions, the erection span and lifting capacity could be modified and customied for each machine.Â
**0 ton Launching Gantry in span by span  **0 ton Launching Gantry in span by spanÂ
Â
General design data:
·Max span : *5mÂ
·Max weight of each segment : *5ton (*0ton)Â
·Max weight of span : **0ton(**0ton)Â
·max longitudinal slope of bridge :±3%Â
·max transversal slope of bridge :±2%Â
·min horizontal radium : **0m(**0m)Â
·Max wind speed on working condition : *2m/sÂ
·Max win speed on static condition :*5m/sÂ
·Safety coefficient :≥2.5Â
·Stability factor of launching gantry :1.3Â
·Launching gantry’s fixing connection can be resistant emergencyconditions such as strong wind and typhoon.Â
·Temperature :from **0℃ to **0℃Â
·Relative humidity :*0%Â
·The whole machine can move backward and forward for bridge erection.
国: | China |
モデル番号: | Launching gantry in span by span |
离岸价格: | ( Negotiable ) Get Latest Price |
ロケーション: | P.R.China |
最低注文量の価格: | - |
最低注文量: | 1 Set |
パッケージの詳細: | sea worth packing |
納期: | 6 months |
供給能力: | 6 Set per Year |
支払いタイプ: | L/C, T/T |
製品グループ : | Launching Gantry |