あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
LFBJMB steel structure space frame construction coal storage shed
Prev
LFBJMB steel structure space frame construction coal storage shed
Next

LFBJMB steel structure space frame construction coal storage shed

离岸价格

Get Latest Price

30 ~ 100 / Square Meter

|

200 Square Meter Minimum Order

国:

China

モデル番号:

-

离岸价格:

30 ~ 100 / Square Meter Get Latest Price

ロケーション:

customize

最低注文量の価格:

30 per Square Meter

最低注文量:

200 Square Meter

パッケージの詳細:

customize

納期:

customize

供給能力:

-

支払いタイプ:

T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal

製品グループ :

今すぐお問い合わせください
無料会員

連絡先担当者 Wendy

11, Nanjing, Jiangsu

今すぐお問い合わせください

タイトルまたは説明

1. The mobile scaffolding operation platform is erected on the space frame of the coal storage shed. The scaffolding column should be welded to the bad steel by electric welding, and the vertical and horizontal scissors need to be set at a distance of **0mm from the bad steel surface. Scaffold braces, stair platforms, safety protection near the working floor, and scaffold pavement shall comply with relevant regulations. Mobile scaffolding must follow the requirements of the key safety construction organization plan when it is towed.
2. The dry coal shed space frame scaffolding needs to be guided by full-time personnel every time it is towed, and the full-time personnel observes it. After a trial drag of **2m, check the deformation of the shelf, and the tow can only be declared after confirming that there is no deformation. After dragging and positioning, deal with the deformation and inertia of the scaffolding for a comprehensive inspection, and use it after confirming that there is no deformation. Concrete components such as steel bolt balls and components of the spherical space frame of the dry coal shed should be hoisted to the scaffolding platform in stages. It should not be piled up on the iron shelf platform in a large amounts at one time, and it should be assembled and hoisted at the same time. The number of inspection personnel on the scaffold platform should be reduced as much as possible, and not many people are concentrated in one span of the scaffold during operation.
3. Workers who assemble steel bolt balls and components in the dry coal shed space frame body should use safety belts, and the safety belts should be placed on a solid structure. The installers must be equipped with electric tool kits and special tool hooks.
4. When positioning, dragging, or jacking the space frame of the dry coal shed, all equipment should be fixed and firm, a solid working platform should be set at the operating position, and walking guardrails or guardrails should be set. When dragging or jacking operations, no one should stay on the spherical space frame of the dry coal shed space frame.
W/app: **6 * *@********************body>

国: China
モデル番号: -
离岸价格: 30 ~ 100 / Square Meter Get Latest Price
ロケーション: customize
最低注文量の価格: 30 per Square Meter
最低注文量: 200 Square Meter
パッケージの詳細: customize
納期: customize
供給能力: -
支払いタイプ: T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
製品グループ : coal shed

Send a direct inquiry to this supplier

To:

Wendy < LFBJMB2021 >

私は知りたい: