あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
MB-08 Double Set of Elastic Outerdoor Wall Lacquer Putty
Next

MB-08 Double Set of Elastic Outerdoor Wall Lacquer Putty

离岸价格

Get Latest Price

|

1 ton Minimum Order

国:

China

モデル番号:

Mebong MB-08

离岸价格:

Get Latest Price

ロケーション:

-

最低注文量の価格:

-

最低注文量:

1 ton

パッケージの詳細:

-

納期:

5-10 days

供給能力:

500 tons/ month

支払いタイプ:

-

製品グループ :

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. Joe

Longkouxi, Guangzhou, Guangdong

今すぐお問い合わせください

製品仕様

タイトルまたは説明

Features:      
1, strong cohesive force, can be well attached to the wall and coating
2, the putty has certain penetrate ability, can close the pore on the surface and formulate a waterproof layer on the surface
3, good flexibility, can meet the requirement of elasticity modulus and keep the elastic coating and the base surface from easy peeling
4, good anti-crack function, can effectively prevent the bottom layer extend toward the surface
5, excellent anti-aging function and good anti-corrosion, non-toxic, harmless and environmental friendly product
Application:
This product is suitable for the surface system of requirements of primer and flexible waterproof coating systems and exterior insulation finish systems
Operation Process:
1, the ratio: *5kg powder + 2.5kg additive + appropriate water, *5kg powder + *0kg additive + appropriate water
2, pouring the additive into the container then adding the powder slowly and appropriate water, stirring them into particle paste with no powder no deposition
3, if the wall is too dry, wet the wall before operation, the substrate surface should be firm, dry and clean, no grease, no wax, and other loose materials, for the obvious pore or hole, harsh them with cement slurry, wipe out the sharp edge.
4, using spatula to scraping the slurry onto the surface, suggesting two times, each time keep the thickness under 1mm, the total thickness should less than 2mm.
5, the second time of scraping should after 6~*2h when finishing the first time
Technical Reference:
Normal Amount
Technical reference
 
For the smooth surface, and the thickness of putty is 1.5~2.0mm, ****0m2/set
1, operation: no scratching barrier
2, dry time: ≤5h
3, initial drying crack: no crack
4, surface PH: ***0
5, water absorption: ≤2
6, bond strength: ≥0.6
7, the dynamic crack resistance: ≥0.3mm
Cautions:
1,do not scraping again and again, finish it within one time
2, after operation, take measures to prevent raining, hot heat, and froze at first *4h
3, the mixed lacquer putty should be used up within 3h, never mix the dry slurry with water and use again
4, this product requiring operating under 5℃~*0℃ situation, never operate under raining.
Store Method:
Store in cool and dry place, for the liquid group should stay in the environment above 5℃, unopened product can be saved for one year.
Packing:
*5kg powder + 2.5kg additive, *5kg powder + *0kg additive
 

国: China
モデル番号: Mebong MB-08
离岸价格: Get Latest Price
ロケーション: -
最低注文量の価格: -
最低注文量: 1 ton
パッケージの詳細: -
納期: 5-10 days
供給能力: 500 tons/ month
支払いタイプ: -
製品グループ : Skim Coat (Wall Putty)

Send a direct inquiry to this supplier

To:

Mr. Joe < Guangzhou Mebong Architectural Decoration Co., Ltd. >

私は知りたい: