离岸价格
Get Latest Price|
100 Piece Minimum Order
国:
China
モデル番号:
YH-10007
离岸价格:
ロケーション:
China
最低注文量の価格:
-
最低注文量:
100 Piece
パッケージの詳細:
1pc/ gift box
納期:
35 days
供給能力:
500000 Piece per Week
支払いタイプ:
T/T
製品グループ :
-
連絡先担当者 Ms. Sara
shipai, Dongguan, Guangdong
STEP 1 Stamping Molding
Molds the metal surface to form the design.
STEP 2 Outline Cutting
* Cutting molds are made separately, then cut to the exact
outline of the design. * Additional outline cutting molds may be
required depending on the complexity of the design. * If a center
hole or cut-out is required, an additional cut-through mold must
be used.
STEP 3 Attachment
Solder attachment onto the back of each piece.
STEP 4 Plating
Plating now can be processed. The quality of plating varies with
the length of time the metal is soaked in the plating liquid.
STEP 5 Polishing
The metal surface is then polished until it is smooth and shiny.
This applies to copper material only. Iron can be polished if
required, but this will incur a surcharge.
STEP 6 Coloring
* Soft enamel is carefully inserted by hand, one color at a time,
using different sized syringes. * Drying. * To prevent defects, a
high degree of skill is required in order to keep each color and
the correct amount of enamel in the proper area.
STEP 7 Cleaning
Excess col or and impurities are then wiped off the metal
surfaces.
STEP 8 Baking
The metal piece is baked at approximately **0F for*2 to *5
minutes.
STEP 9 Epoxy Coating
Clear epoxy is then applied to the surface to protect the enamel
from color fading and cracking. ( Epoxy coating is optional and
provided according to customer’s requirements )
STEP *0 Inspection & Packing
All it ems are strictly inspected before delivery. Customer’s
satisfaction is guaranteed!
国: | China |
モデル番号: | YH-10007 |
离岸价格: | Get Latest Price |
ロケーション: | China |
最低注文量の価格: | - |
最低注文量: | 100 Piece |
パッケージの詳細: | 1pc/ gift box |
納期: | 35 days |
供給能力: | 500000 Piece per Week |
支払いタイプ: | T/T |
製品グループ : | - |