离岸价格
Get Latest Price75000000 ~ 8e+07 USD / Set ( Negotiable )
|1 Set Minimum Order
国:
Russia
モデル番号:
1
离岸价格:
75000000 ~ 8e+07 USD / Set ( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
75000000 per Set
最低注文量:
1 Set
パッケージの詳細:
No
納期:
30
供給能力:
1 Set per Year
支払いタイプ:
T/T
製品グループ :
Russia
連絡先担当者 Mr. Vasiliy
Okeanskiy pr., Vladivostok, Russia
We sale granite deposit in the Voronezh region, or to attract
investment in this project. Highly profitable
business. All the necessary calculations and documents,
we are ready to provide interested investors. We are seeking for
investments, finance, partnership or buyer to this busines.
The Project in its basic version (production rate 4 m. tons)
will make a substantial positive effect both on regional economy
development and on Russian economy development on the whole. The
Project realization will increase the GDP (gross domestic
product) no less than on *8,*8 m euro. Tax payment will be *3.6 m
euro per annum.
Realization of such huge Project on deposit development and
aggregate preparation plant construction will allow to reduce
crushed stone deficit in the region, that is now covered by import
from Ukraine.
The Project will contribute to implementation of federal target
programs and national projects, including such as: Housing, Russia
Transport System Modernization and subprograms Railway Transport
Facilities, Highway Transport.
Moreover, the Project will have a high positive effect on the
related sectors construction, railway transport, electric power
industry, metallurgy, public utility industry and etc.
By the time when the Project reaches its full capacity the number
of work places will be **0 and in case of maximum capacity they
will increase up to ***0. The annual wage will come to 1,**3 m.
euro. Furthermore, the new work places will be created due to the
work growth in related sections ( construction, concrete production
and etc.).
The Project will ensure increase of initial and additional
investments into the industry within *0 years.
New infrastructure facilities will be erected during the project
realization, including railways lines, highways, buildings and
etc.
It should be mentioned that there is a possibility to create a
complex program of mineral resources development in Voronezh
Region. One of the biggest and potentially productive sulphide
platinum cupronickel ores deposit is located near the Donskoi
Granit deposit in Voronezh Region.
Donskoi Granit district is located in the Pavlovsky District,
Voronezh Region in the northeastern part of Kazinsky deposit.
The district is at 3 km to the northeast of Bolshaya Kazinka
village, the nearest railway station Granitnaya is located at *2 km
to the northeast from the district. Don navigable river is at the
distance of 6 km from the district to the southwest. Moscow-Rostov
highway (Don, M*4) is at 4.5 km to the northeast from the district.
Developed infrastructure make the project more attractive.
Mining and geological conditions are favorable for
open extraction. To reduce any negative effect on the environment
to the minimum the project documentation provides for a complex
environmental activity (local people and state authorities
representatives have supported the Project during public
discussions).
Hydrologic conditions are relatively complicated and require to
take complex actions (drainage and pumping-out). Geologic
exploration, lab studies and appraisal of reserves were conducted
at a high level.
The crushed granite of this deposit has good mechanical
features and maybe used for road construction, mortar
mixtures and concrete. A possibility of block stones mining
expand potential markets of the Project.
A small amount of sand at the deposit also has quality parameters
that allow to use it in the field of roads construction and mortar
mixtures production. There is a possibility to augment stocks of
mortar sands in the process of deposit extension and further
geological research.
Resources volume of the deposit is significant and
is in several times excess over minimal values required for
financial assessment (**4 **5 thousand m3 of crushed aggregates and
***7 thousand m3 of mortar sands).
A significant increase of the resources deposit is possible
during further explorations of the depth and periphery of the
district.
Mining and geological conditions are favorable for surface
mining.
To get more accurate parameters of the long-term development of the
Project we recommend to make a detail analysis of optimal
dimensions and models of mining equipment. It is
recommended to manufacture any standard metallic constructions for
aggregate processing plant in Russia for the purpose of control
over the manufacturer. It is expected that the Project will have 3
parallel production lines, each of them will have the capacity
about 3.5 m tons of commodity output per annum, that will allow to
reach the designed capacity in a flexible form.
The choice of equipment and technology of crushing are based on a
technological map, suggested by Metso Minerals company with
allowance for quality features of the material that will be
processed and requirements to final product standards.
Granite chips production will include three stages of crushing with
a final manufacturing of the following fractures:
• ***0 mm (*2.7% of fragmented
rock);
• ****0 mm (*2.5%);
• ****0 mm (*3%),
• Sand from wastes, **5 mm (*4.8
%)
•mixture of
stones/sandС2
(7%).
国: | Russia |
モデル番号: | 1 |
离岸价格: | 75000000 ~ 8e+07 / Set ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 75000000 per Set |
最低注文量: | 1 Set |
パッケージの詳細: | No |
納期: | 30 |
供給能力: | 1 Set per Year |
支払いタイプ: | T/T |
製品グループ : | Mines,deposits |