离岸价格
Get Latest Price|
- Minimum Order
国:
China
モデル番号:
000
离岸价格:
ロケーション:
-
最低注文量の価格:
-
最低注文量:
-
パッケージの詳細:
-
納期:
-
供給能力:
-
支払いタイプ:
-
製品グループ :
-
連絡先担当者 Ms. Q
CHENG YANG, QING DAO, SHAN DONG
1.Along top keel 2.Along floor keel 3.Horizonal keel 4.Vertical keel xxxxx screw xxxxx bolt 7.Utility’s board xxxxx skirting boards INSTALLATION METHODS A.Light steel keel frame 1.Draw the installation guideline. 2.Use the shooting nail or expansion bolt to fix the along top keel and the along floor keel on the ceiling and floor. 3.And arrange the vertical keel as per the request and install the horizontal keel. xxxxx method of the boards xxxxx cut the boards as per the required size which is *0mm shorter than the wall height. xxxxx boards should be fixed on the keels by the tapping screews in seam misplacement form,the distance between tapping screews is ******0mm.And esch screew head should enter 0.5mm depth into the boards. 3.Please leave a seam between boards about 4mm width. 4.When fixing the xxxxx should be mounted from its center to sdges.Don’t fix it at different points at same time avoid the over bending of the boards. 5.Before fixing we can place the mineral wool or glass fiber into the empty space between the boards to get the better soundproofing and fireproofing effects.
国: | China |
モデル番号: | 000 |
离岸价格: | Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | - |
パッケージの詳細: | - |
納期: | - |
供給能力: | - |
支払いタイプ: | - |
製品グループ : | - |