Prestressed Concrete Spun Electric Pole Mould Prestressed Concrete Spun Electric Pole Mould
Next

Prestressed Concrete Spun Electric Pole Mould

离岸价格

Get Latest Price

300 ~ 500 / Meter ( Negotiable )

|

5 Meter Minimum Order

国:

China

モデル番号:

FRT#190

离岸价格:

300 ~ 500 / Meter ( Negotiable ) Get Latest Price

ロケーション:

China

最低注文量の価格:

300 per Meter

最低注文量:

5 Meter

パッケージの詳細:

box

納期:

15days

供給能力:

5000 Meter per Week

支払いタイプ:

T/T, L/C

製品グループ :

-

今すぐお問い合わせください

Furat

China

無料会員

連絡先担当者 Grant

Lingang Industry Park, Xiashu Town, Jurong City,Jiangsu Province, Yancheng, Jiangsu

今すぐお問い合わせください

製品仕様

  • COLOR:yellow or can be customized
  • length:can be customized
  • top diameter:can be customized
  • bottom diameter:can be customized

タイトルまたは説明


Prestressed Concrete Spun Electric Pole Mould
Concrete electric spun pole mold adopts the riveting structure, which is processed thousand ton press machine and lathe. There are two kinds of concrete spun pole mold manufacturing method which is overall manufacturing and joint type. The overall manufacturing of concrete spun pole mould own more advantage on rigidity and strength, but the manufacturing need a long lathe (mold below *2m can be made with overall process), and transport is not convenient. Therefore, the following is about the joint type concrete pole mould .
 
 
 
When make the half concrete pole mold, the cylinder plate generally use thickness of*0mm Q**5 steel plate, because the national standard for concrete electric pole in the provisions of the conical poles ratio of 1:*5. For this purpose, the cylinder mould plate after cutting should be formed by cold pressing in a dedicated 1: *5 tapered die. Due to the limited width of the shears, the length of the cold pressed mold is limited by the length of the cold working equipment. Therefore, the length of the pipe wall is designed to be 2m (for a reference) and then Docking. In addition, it is limited by the processing range of the machining equipment and the restriction of the transport vehicle and the road. So the design is generally 4M long limit, the individual must not exceed 5M. In order to ensure that the pole steel mold in the production of poles, that is, to high-speed smooth operation, and can not be deformed, for this purpose in the cylinder board to run the wheel support plate and liner; , The connection flange at the welding section. But the thickness of only *0MM cylinder board, high-speed operation can not guarantee the reliability, must improve the cylinder surface longitudinal and lateral stiffness. The general practice is to weld the outer surface of the cylinder plate to support the longitudinal, transverse ribs of the cylinder plate, and the end plate flange attached to the longitudinal ribs and the cylinder plate. In the reinforced plate welding bolt hanging ear (commonly known as climbing), matched with the first head of the first screw, washers, nuts, pins. This basically formed a steel mold welded structure of the blank pieces. So that the rigidity of steel mold greatly improved, the basic can meet the requirements of products. How do two halves fit together as a whole? According to the provisions of JC / T*******1 standards. And two reinforcing plates thicker than the cylinder plate are caulked on the cylinder plate at the split mold face of the mold half. One is to increase the horizontal end of the stiffness, the second is to strengthen the board to draw the bumps and groove to. (In the high-speed centrifugal process to play a sealed role) to prevent the cement slurry in the centrifugal force from the slot at the mouth of the body, the body of the mold, Resulting in leakage phenomenon. Reinforced plate and pipe wall is riveting, while the reinforcement plate can also be welded on the pair of bolt lugs, lifting and turning the ring can also be welded on the reinforcement plate.
 
 
 
Concrete Spun Pole steel mold due to transport and technology and other reasons are manufactured with joint type, and finish assembly in concrete electricity poles factory. The connecting flange end and concrete pole mold wheel are precisely processed because the connection accuracy directly affects the curvature of the full length of the steel mold and the smoothness of the run, and the runway surface quality is poor and can cause runaway There are scars, to be Seiko repair, repair glitches only allow sanding polished, the scar around the prominent part of the file can be used to file carefully file, file range is not allowed to exceed the prominent area.
 

Inner diameter of small side(MM) Running wheels distance(MM) Diameter of running wheel(MM) Length(M)
Ф**0 ***0 ***0 Ф**0 **7
Ф**0 ***0 ***0 Ф**0 **7
Ф**0 ***0 ***0 Ф**0 **8
Ф**0 ***0 ***0 Ф**0 **8
Ф**0 ***0 ***0 Ф**0 ***0
Ф**0 ***0 ***0 Ф**0 ***2
Ф**0 ***0 ***0 Ф**0 ***2
Ф**0 ***0 ***0 Ф**0 ****8
Ф**0 ***0 ***0 Ф**0 **9
Ф**0 ***0 ***0 Ф**0 **9
Ф**0 ***0 ***0 Ф**0 **9
Ф**0 ***0 ***0 Ф**0 **9

Prestressed Concrete Spun Electric Pole Mould

国: China
モデル番号: FRT#190
离岸价格: 300 ~ 500 / Meter ( Negotiable ) Get Latest Price
ロケーション: China
最低注文量の価格: 300 per Meter
最低注文量: 5 Meter
パッケージの詳細: box
納期: 15days
供給能力: 5000 Meter per Week
支払いタイプ: T/T, L/C
製品グループ : -