离岸价格
Get Latest Price|
- Minimum Order
国:
China
モデル番号:
-
离岸价格:
ロケーション:
-
最低注文量の価格:
-
最低注文量:
-
パッケージの詳細:
-
納期:
-
供給能力:
-
支払いタイプ:
-
製品グループ :
-
China
連絡先担当者 joy
TEDA, Tianjin, Tianjin
PU Waterproof Coating for Bathrooms Waterproofing Film Membrane
Double component waterproofing coating belongs to solidify waterproof materials, and the Group A is isocyanate terminated pre-polymer polycondensated by polyether and isocyanate, Group B is colored liquid composed of plasticizer, curing agent, thickening agents, coagulant agent and filler, Mix Group A and B evenly as rate and brush on the waterproofing substrate surface, form a elastisic and rubber-like coating film through cross-linking and solidifying at normal temperature , which plays a role of waterproofing.
Main features:
1. High elasticity and extensibility of film forming, seamless4. Environmental protecting product
Technical Data
Application:
1.It is suitable for basement,toilet,swimming pool, pond, refrigeration storage.
2.It is specially suitable for underground project where the substrate is moist and structure is complex. It also can be used to non-exposed roof project.
Installation:
Make primer: Mix DPU and solvent by A:B:Solvent=1:2:1, then brush primer on the foundation until it is Mix A:B=1:2. Scratch the coating by 3 times. The first layer curing needs 20-24 hours. When the first layer is solidifying, do the second layer. The direction of the second layer should be at right angles to the first layer. Then repeat the third one. If add protective layer, before the third layer is cured, scatter clean sand on its surface. After the membrane is cure, can begin the protective layer construction.国: | China |
モデル番号: | - |
离岸价格: | Get Latest Price |
ロケーション: | - |
最低注文量の価格: | - |
最低注文量: | - |
パッケージの詳細: | - |
納期: | - |
供給能力: | - |
支払いタイプ: | - |
製品グループ : | - |