离岸价格
Get Latest Price12 ~ 23 USD / Piece ( Negotiable )
|100 Piece Minimum Order
国:
China
モデル番号:
KH-SW-240-001
离岸价格:
12 ~ 23 USD / Piece ( Negotiable )Get Latest Price
ロケーション:
-
最低注文量の価格:
12 per Piece
最低注文量:
100 Piece
パッケージの詳細:
bundled or bulk, as per customer
納期:
15 days
供給能力:
8 Forty-Foot Container per Week
支払いタイプ:
T/T
製品グループ :
China
連絡先担当者 Fu
Room B303, Jingying Garden, No. 3, Jingsha 2nd Road, Shajing Street Office, Shajing Town, Bao'a, Shenzhen, Guangdong
Product detail:
1.Q**5 or Q**5 Galvanized Scaffolding Metal Decking
2.Material:Q**5,Q**5,Q**5
3.Surface treat:hot-dipped galvanized
4.Width:**0,**5,**0,**0,**0,**0,**0mm
5.Thickness: 1.**2.0mm
6.Length: To be produced as per your requirement
7.Folding box should be more stronger
8.Patent holes design to be reduced products' weight
9.Patent ribs make products stronger and drain the water providing any rain days
*0.Life time:5 years guarantee
Dimension:
Item | Wide (mm) | Height (mm) | Thickness (mm) | Length (m) | Folding Box | support bracket | Weight (kg) |
KH-SW*******1 | **0 | *5 | 1.1 | 1.0 | Normal | flat support | 3.*4 |
KH-SW*******2 | **0 | *5 | 1.1 | 1.5 | Normal | flat support | 5.*2 |
KH-SW*******3 | **0 | *5 | 1.1 | 2.0 | Normal | flat support | 6.*9 |
KH-SW*******4 | **0 | *5 | 1.1 | 2.5 | Normal | flat support | 8.*6 |
KH-SW*******5 | **0 | *5 | 1.1 | 3.0 | Normal | flat support | *0.*3 |
KH-SW*******6 | **0 | *5 | 1.1 | 4.0 | Normal | flat support | *3.*8 |
KH-SW*******7 | **0 | *5 | 1.1 | 1.0 | Normal | rectangular support | 3.*4 |
KH-SW*******8 | **0 | *5 | 1.1 | 1.5 | Normal | rectangular support | 5.*2 |
KH-SW*******9 | **0 | *5 | 1.1 | 2.0 | Normal | rectangular support | 7.*9 |
KH-SW*******0 | **0 | *5 | 1.1 | 2.5 | Normal | rectangular support | 9.*6 |
KH-SW*******1 | **0 | *5 | 1.1 | 3.0 | Normal | rectangular support | *0.*3 |
KH-SW*******2 | **0 | *5 | 1.1 | 4.0 | Normal | rectangular support | *4.*8 |
KH-SW*******3 | **0 | *5 | 1.1 | 1.0 | Normal | trapezoid support | 3.*1 |
KH-SW*******4 | **0 | *5 | 1.1 | 1.5 | Normal | trapezoid support | 5.*6 |
KH-SW*******5 | **0 | *5 | 1.1 | 2.0 | Normal | trapezoid support | 7.*0 |
KH-SW*******6 | **0 | *5 | 1.1 | 2.5 | Normal | trapezoid support | 8.*4 |
KH-SW*******7 | **0 | *5 | 1.1 | 3.0 | Normal | trapezoid support | *0.*8 |
KH-SW*******8 | **0 | *5 | 1.1 | 4.0 | Normal | trapezoid support | *4.*7 |
KH-SW*******9 | **0 | *5 | 1.1 | 1.0 | Equilateral | flat support | 3.*5 |
KH-SW*******0 | **0 | *5 | 1.1 | 1.5 | Equilateral | flat support | 5.*2 |
KH-SW*******1 | **0 | *5 | 1.1 | 2.0 | Equilateral | flat support | 6.*9 |
KH-SW*******2 | **0 | *5 | 1.1 | 2.5 | Equilateral | flat support | 8.*6 |
KH-SW*******3 | **0 | *5 | 1.1 | 3.0 | Equilateral | flat support | |
KH-SW*******4 | **0 | *5 | 1.1 | 4.0 | Equilateral | flat support | *3.*8 |
KH-SW*******5 | **0 | *5 | 1.1 | 1.0 | Equilateral | rectangular support | 3.*5 |
KH-SW*******6 | **0 | *5 | 1.1 | 1.5 | Equilateral | rectangular support | 5.*2 |
KH-SW*******7 | **0 | *5 | 1.1 | 2.0 | Equilateral | rectangular support | 7.*9 |
KH-SW*******8 | **0 | *5 | 1.1 | 2.5 | Equilateral | rectangular support | 9.*6 |
KH-SW*******9 | **0 | *5 | 1.1 | 3.0 | Equilateral | rectangular support | *0.*3 |
KH-SW*******0 | **0 | *5 | 1.1 | 4.0 | Equilateral | rectangular support | *4.*8 |
KH-SW*******1 | **0 | *5 | 1.1 | 1.0 | Equilateral | trapezoid support | 3.*1 |
KH-SW*******2 | **0 | *5 | 1.1 | 1.5 | Equilateral | trapezoid support | 5.*6 |
KH-SW*******3 | **0 | *5 | 1.1 | 2.0 | Equilateral | trapezoid support | 7.*0 |
KH-SW*******4 | **0 | *5 | 1.1 | 2.5 | Equilateral | trapezoid support | 8.*4 |
KH-SW*******5 | **0 | *5 | 1.1 | 3.0 | Equilateral | trapezoid support | *0.*7 |
KH-SW*******6 | **0 | *5 | 1.1 | 4.0 | Equilateral | trapezoid support | *3.*4 |
KH-SW*******7 | **0 | *5 | 1.0 | 1.0 | Normal | flat support | 3.*7 |
KH-SW*******8 | **0 | *5 | 1.0 | 2.0 | Normal | flat support | 6.*3 |
KH-SW*******9 | **0 | *5 | 1.0 | 3.0 | Normal | flat support | 9.*0 |
KH-SW*******0 | **0 | *5 | 1.0 | 4.0 | Normal | flat support | *2.*7 |
KH-SW*******1 | **0 | *5 | 1.0 | 1.0 | Normal | trapezoid support | 3.*5 |
KH-SW*******2 | **0 | *5 | 1.0 | 2.0 | Normal | trapezoid support | 6.*1 |
KH-SW*******3 | **0 | *5 | 1.0 | 3.0 | Normal | trapezoid support | 9.*8 |
KH-SW*******4 | **0 | *5 | 1.0 | 4.0 | Normal | trapezoid support | *2.*5 |
KH-SW*******5 | **0 | *5 | 1.2 | 1.0 | Normal | rectangular support | 4.*6 |
KH-SW*******6 | **0 | *5 | 1.2 | 2.0 | Normal | rectangular support | 7.*2 |
KH-SW*******7 | **0 | *5 | 1.2 | 3.0 | Normal | rectangular support | *1.*8 |
KH-SW*******8 | **0 | *5 | 1.2 | 4.0 | Normal | rectangular support | *4.*4 |
Features:
1. The Pierced Steel Plank(PSP)is strong, light, simple, fool proof, safe and inexpensive.
2. It is so simple that it can be laid on any fairly level piece of land with a few days work.
3. It is so foolproof that if some parts are lost, it will still be useful. It must be safe for
any type of construction, under any weather conditions.
4. It is be so light that it can be transported swiftly and easily to any spot
5. The PSP(Piereced Steel Plank) was designed with holes to reduce the weight,
improve traction and facilitate drainage. Flanging the holes kept the mat durable
by compensating for the strength lost by removing a portion of the metal
Wide variety of consumers:
1. Temporary and permanent aircraft landing fields or runways
2. Temporary roadways or access routes for trucks, heavy equipment, backhoes, concrete trucks, tree trimmers and cranes.
3. Construction Sites
4. Helicopter Landing Pads
5. Irrigation Tracks
6. Launches and boat ramp extensions
7. Corrals and chutes for livestock
8. Warehouse flooring 9. Mobile home moving
*0. RV tracks or storage areas
*1. Storage platforms for heavy equipment, supplies or runways.
How to extend scaffolding walking Board
1.Have a 'competent person' assess and document the needs of the area for extended
scaffolding. A 'competent person' in some states is required to have special licensing,
and in others experience with scaffolding set up is enough. What is important is that
you keep some form of documentation that the person designated as 'competent'
approves each step of the scaffolding assembly
2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,
make sure that the supports for your scaffolding plans follow the assembly plans
3.Lay your first plank across the supports of your platform. Have your competent
person check that each plan extends a minimum of 6 inches and a maximum of
*2 inches past any support bracket.
4.Extend your scaffolding plank by laying the next plank over it. If the span
of your support is 7 feet, your plans must overlap a minimum of 6 inches up
to a maximum of *2 inches. If the span of your plank support is *0 feet, the boards
must overlap *2 inches.
5.You may provide cleats to additionally connect your extended scaffold planks again.
Ask your competent person to designate that the cleats are provided and used only
to prevent the scaffold planks from sliding and not as a means of
providing any
国: | China |
モデル番号: | KH-SW-240-001 |
离岸价格: | 12 ~ 23 / Piece ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 12 per Piece |
最低注文量: | 100 Piece |
パッケージの詳細: | bundled or bulk, as per customer |
納期: | 15 days |
供給能力: | 8 Forty-Foot Container per Week |
支払いタイプ: | T/T |
製品グループ : | Scaffolding Plank |