あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Refining Flux
Next

Refining Flux

离岸价格

Get Latest Price

( Negotiable )

|

1 Ton Minimum Order

国:

China

モデル番号:

SX-J

离岸价格:

( Negotiable ) Get Latest Price

ロケーション:

Foshan

最低注文量の価格:

-

最低注文量:

1 Ton

パッケージの詳細:

box

納期:

15

供給能力:

200 Ton per Week

支払いタイプ:

L/C, T/T

製品グループ :

今すぐお問い合わせください
無料会員

連絡先担当者 Jasmine

Foshan, Guangdong

今すぐお問い合わせください

製品仕様

  • Brand Name: Sanxiang
  • Bright silvery and clean :Negotiable

タイトルまたは説明

 Refining Flux     
 
Principle
By use of powder spraying machine,spray powder refining flux into aluminium melt bath with high purity nitrogen,Under the combined effect of dispersed tiny nitrogen bubble and flux,it will eliminate the entrapped slag and hydrogen in aluminium liquid.
 

1.High efficiency,**0%efficient composition .
2.Strong purifying capacity up to domestic advanced level.
3.Less pollution,small consumption and low cost.
 

Use method
Add refining flux of requires amount into refining tank and cover it properly,turn on the switch of refining tank and connect nitrogen gas ,When furnace flux is spraying out of refining iron tube ,insert it into the furnace and move all around inside evenly for 2or 3 times. When powder inside the tank is sprayed completely,first draw out the refining tube out of aluminium liquid, and then switch off nitrogen gas.
 

Technical parameters
1.Refining temperature:**0℃~**0℃
2.Refining time :8~*5 minutes (6~*0ton furnace)
3.Nitrogen pressure:1.2~1.8kg/mm2
4.Use level 1~3kg for one ton aluminium
 
 
Precautions
1.The refining time shall be extended along with increase of aluminium melting volume.
2.The powder feeding rate can be controlled by adjusting switch on the bottom of refining tank,Generally ,there shall be powder spraying out within the rang of refining time .
3.The end of refining tube shall be inserted into the furnace by 2/3of the aluminium liquid depth ,The tube shall be moved to left and right side,The furnace wall and bottom shall not be touched to prevent from clogging of tube.
4.The turbulence height of aluminium liquid shall be controlled by nitrogen pressure ,Under the premise of preventing from cllogging of tube ,the higher turbulence is acceptable,It is better to control below *5cm.

Packaging and storage 
It is 2kg for each package and *0kg for each box,which shall be stored in a dry and ventilated place, The storage period is one year if plastic bag are not damaged.It can be further used when it is ground into powder and dried under the temperature of **0℃

国: China
モデル番号: SX-J
离岸价格: ( Negotiable ) Get Latest Price
ロケーション: Foshan
最低注文量の価格: -
最低注文量: 1 Ton
パッケージの詳細: box
納期: 15
供給能力: 200 Ton per Week
支払いタイプ: L/C, T/T
製品グループ : solvent series

Send a direct inquiry to this supplier

To:

Jasmine < Sanxiang FoShan NanHai Sanxiang Aluminium Industry Auxiliary Materials CO., LTD >

私は知りたい: