离岸价格
Get Latest Price6000 ~ 7000 / Unit
|1 Unit Minimum Order
国:
China
モデル番号:
TYFKE-125
离岸价格:
6000 ~ 7000 / Unit Get Latest Price
ロケーション:
Chongqing
最低注文量の価格:
6000 per Unit
最低注文量:
1 Unit
パッケージの詳細:
Carton packing
納期:
5-6days
供給能力:
1 Unit per Week
支払いタイプ:
T/T, Western Union, PayPal, Other
製品グループ :
-
連絡先担当者 Mr. Fei
JIguanshi town, Chongqing, Chongqing
Company profile:
ChongQing TongYang Electrical Equipment Co.,ltd(CTEC) is specialized in small and meduim hydropower Projects,the team has professional knowledge,rich practices&expreience in this especial area more than *0 years.CTEC main study ,design ,product ,install,debug intergated automatic control cabinet,power plant computer(mobile phone) monitoring,governors.hydroturbine,electrical control cabinet.
Data:
1.Automatically boot to no-load
This Low voltage automatic system has designed two boot program according to power plant which has governor or not.
2.No Governor
Early ,in order to save cost and some aspects ,there is no governor in power plant,so it will lead to some trouble such as over adjust or hysteresis adjust when automatic adjusting needles or guide vane opening.According to the problem as above mentioned,our products deal with the trouble and make it sooner ,more relax,more saver.
3.Governor
Recent years,most power plant with governor ,it is easier to realize automatic,only need to boot ,the governor will do the rest things.
When the governor or the products will be frequency to the speed of *5%,automatic system will send a wound ,the voltage of the machine is taken as system voltage stability,if the excitation failure,touch screen or background will send up the wound failure alarm information and voice information to prompt user.
4.No-load to grid.
When the generator start excitation successfully,automatic system will increase needles and guide vane opening ,and increase the frequency *9 to *1HZ ,at the same time ,the automatic system will give a circuit breaker stored energy signal,judgment after storage in place,then send an synchronoscope signal,the synchronoscope is starting working,while the automatic system start to increase or reduce the number of needles and guide vane opening.
5.Parallel to a given.
If the reactive power in phase after grid,automatic system will take reactive power to corresponding power factor first ,then add active power,coordinate with each other ,in order to achiever the given value of power factor ,active power.
2.One
step stop
After Background or touch screen click one step command ,program
starts executing load and reactive,after reach set value then
splitting .After circuit breaker began to close spray needles or
guide vane opening.Excitation is lower than *1HZ ,de-excitation
automatically,as long as the injection needle or guide vane opening
down to below *1HZ ,excitation will de-excitation,speed is lower
than *5% will automatically stop,and less than 5% after delayed
braking reset after a period of time.Some power station has no
brakes,can fold to implement or water resistance,and then close the
spray needle or guide vane,stop using inertia of unit.
3.Emergency Stop
Stop by commonly:over speed,over voltage,over current,high loss of pressure,temperature,and water accident.The above situation occurs,automatic system will jump over circuit breaker,fold to implement or spray water resistance ,and close needle or guide vane,if there is electric institutions at the same time ,the main valve will close the main valve.
4.Measurement
On the touch screen or background computer display voltage,current,frequency,power factor ,active power,electricity ,etc.
5.Signal
On the touch screen or the background computer display related signal:such as circuit breaker ,needles or guide vane,circuit breaker stored energy.
According to water level automatic control load to increase efficiency.Water transport has two ways:One is radio transmission ,the other is GPRS traffic by telecom or mobile transmission.so by mobile phone or any link network computer can monitor the plant data.In the reservoir pressure sensor or pool
7.before installation ,can accurately response level of high and low position.Water level signal has up up limit ,up limit ,down limit,down down limit.,can tell water level.When water level reached up up limit ,if only opened a units,automatic process will be very good to determine whether the other units meet first boot conditions ,if meet ,it will automatically open the other units and grid-connected power generation with *0% of the load,the program will observe the water level of the *0 minutes for fall ,if water levels are still rising load to *0^,and so on.
8.Manual function
In addition to the automatic function,this system also with manual :manual excitation ,magnetic,hand over the same period,manual or active reactive power ,manual key ,etc.
9.The load curve
The cabinets can be describe curve according to unit real time
power ,it is easy to understand recent situation of
generating.
*0.Operating Log
The operators key operations can be recorded,understand the history
in the course of unit operation.
*1.Communication function
Through RS**5 communication cabinets ,it is convenient to realize
remote monitoring.
国: | China |
モデル番号: | TYFKE-125 |
离岸价格: | 6000 ~ 7000 / Unit Get Latest Price |
ロケーション: | Chongqing |
最低注文量の価格: | 6000 per Unit |
最低注文量: | 1 Unit |
パッケージの詳細: | Carton packing |
納期: | 5-6days |
供給能力: | 1 Unit per Week |
支払いタイプ: | T/T, Western Union, PayPal, Other |
製品グループ : | - |