离岸价格
Get Latest Price1 ~ 2 USD / Meter ( Negotiable )
|500 Meter Minimum Order
国:
China
モデル番号:
-
离岸价格:
1 ~ 2 USD / Meter ( Negotiable )Get Latest Price
ロケーション:
China
最低注文量の価格:
1 per Meter
最低注文量:
500 Meter
パッケージの詳細:
Plywood box with steel frame
納期:
30 days from Deposit Received Date
供給能力:
2000 Meter per Day
支払いタイプ:
T/T
製品グループ :
連絡先担当者 Ms. Abby
Maji Chazhen Industrial Zone, Yangzhou, Jiangsu
Stainless-Steel-Tube-Integral-Low-Fin-Tube-Maximizing-Heat-Transfer
Fabrication Process
The process of integral low finned tube is
similar to extruded finned tube, the difference is the fin
of low fin tube is made from the same tube obtaining a fin of
lower height. After rolling process, the outer surface of
tube is formed with thread, which makes the finned tube have a
higher heat transfer capacity.
Minyang
Heat Transfer
manufacturers integral low fin tubes with superior
dimensional control in Copper, Brass, Cupro Nickel, Stainless
Steel & Carbon Steel tube materials for a wide variety of
heat transfer applications. Our facilities are capable of
producing all types of integral low fin tubes / integral medium
fin tubes and integral high fin tubes to suit every customers
specific requirements..
Materials
standard
Copper Alloy: ASTM B*5/ B**9 C****0/ ****0/
****0/ ****0/ ****0
Carbon Steel: SA**9 and
others
Stainless Steel: SS**4, SS**6/
SS**6L
EN and DIN standards are also available on
request.
国: | China |
モデル番号: | - |
离岸价格: | 1 ~ 2 / Meter ( Negotiable ) Get Latest Price |
ロケーション: | China |
最低注文量の価格: | 1 per Meter |
最低注文量: | 500 Meter |
パッケージの詳細: | Plywood box with steel frame |
納期: | 30 days from Deposit Received Date |
供給能力: | 2000 Meter per Day |
支払いタイプ: | T/T |
製品グループ : | Extruded Fin Tube |