あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
SZL Series Water tube Shop-assembled Boiler
Next

SZL Series Water tube Shop-assembled Boiler

离岸价格

Get Latest Price

( Negotiable )

|

1 Set Minimum Order

国:

China

モデル番号:

SZL6-20tons

离岸价格:

( Negotiable ) Get Latest Price

ロケーション:

Wuxi

最低注文量の価格:

-

最低注文量:

1 Set

パッケージの詳細:

shipping container

納期:

60~90 days

供給能力:

50 Plant per Year

支払いタイプ:

L/C, T/T

製品グループ :

-

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. Martin

China, Wuxi, Jiangsu

今すぐお問い合わせください

製品仕様

  • horizontal dual cylinder portrait arranged:Uses divided air supply plenum
  • Ensures proper air distribution in different burning se:Improves combustion control
  • Air enters from two sides to equalize air pressure acro:bracket drawing

タイトルまたは説明

Introduction to SZL Series of Boilers:
The
SZL series of boilers is the horizontal dual cylinder portrait arranged, chain grating, pipe steam and hot water boiler designed by our technical personnel according to advanced technology and experience from both home and abroad. The technological, performance and environmental protective index of this series of products reaches an international advanced level, and this product is the mainstay of the boiler industry.
The boiler uses either a quick fitting or assembly structure.
The **6t/h boiler is a quick fitting pipe structure, exit shop after completely assembled; The boiler of ***5t/h is composed of two main components: The upper assembled component is the body heat accepting part, and the lower assembled component consists of the combustion equipment. The former part of the boiler body is arranged as a water-cooling wall, the upper part of it is connected to the boiler cylinder, and the  lower part is connected to a collection chest, in order  to form a combustion room and to absorb the radiated heat from the furnace; its rear part is arranged with a dense convection pipe bundle between the upper and lower boiler cylinders; the high temperature smog after combustion shall stand  twice before being  flushing transversely to the heat accepting surfaces, and shall  introduced to the coal saver and singly arranged, and allowed to flow into duster and exhausted from the chimney in the end. The *0t/h assembled water pipe 
boiler is composed of a front furnace,
rear furnace, convection pipe bundle coal saver and chain grating, all of  which are assembled in large components respectively for delivery.
This series of boiler has all the merits from quick fitting boilers, it features a compact
structure, the boiler shop is of arranged on one storey and is convenient for site installation, offering a short construction period, cheap and simple to operate etc. This series of steam boiler is suitable for industrial and living steam consumption; the correspondent capacity hot water boiler is intended for both industrial and civil heating purposes.  
Service type
SZL**1.**-ALL、SZL***-ALL、SZL2.**0.7/*5/**-ALL 
SZL**1.**-ALL、SZL**1.*-ALL、SZL4.**1.0/**5/**-ALL 
SZL**1.**-ALL、SZL**1.**-ALL、SZL**2.**-ALL、SZL4.**1.0/1*5/**-ALL 
SZL**1.**-ALL、SZL**1.*-ALL、SZL**2.**-ALL、SZL5.**1.0/**5/**-ALL、SZL5.**1.*5/**0/**-ALL 
SZL***1.**-ALL、SZL***1.*-ALL、SZL***2.**-ALL、SZL**1.0/**5/**-ALL、SZL**1.*5/**0/**-ALL 
SZL***1.**-ALL、SZL***1.*-ALL、SZL***2.**-ALL、SZL*0.**1.0/**5/**-ALL、SZL*0.**1.*5/**0/**-ALL 
SZL***1.*-ALL、SZL***2.**-ALL、SZL***1.0/**5/**-ALL、SZL***1.*5/**0/**-ALL 
SZL***1.*-ALL、SZL***1.*-ALL、SZL***2.*5/***-ALL、SZL*7.**1.0/**5/**-ALL、SZL*7.**1.*5/**0/**-ALL  

国: China
モデル番号: SZL6-20tons
离岸价格: ( Negotiable ) Get Latest Price
ロケーション: Wuxi
最低注文量の価格: -
最低注文量: 1 Set
パッケージの詳細: shipping container
納期: 60~90 days
供給能力: 50 Plant per Year
支払いタイプ: L/C, T/T
製品グループ : -

Send a direct inquiry to this supplier

To:

Mr. Martin < Zozen International Boiler CO >

私は知りたい: