あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Wood-Plastic Composite Formwork Wood-Plastic Composite Formwork
Next

Wood-Plastic Composite Formwork

离岸价格

Get Latest Price

|

1000 Square Meter Minimum Order

国:

China

モデル番号:

HX-003

离岸价格:

Get Latest Price

ロケーション:

Foshan,China

最低注文量の価格:

-

最低注文量:

1000 Square Meter

パッケージの詳細:

standard packing

納期:

20 to 30 days

供給能力:

100000 Square Meter per Month

支払いタイプ:

L/C, T/T

製品グループ :

今すぐお問い合わせください
無料会員

連絡先担当者 Ms. Chan

27th Baota Road Shiwan Town,Chancheng District, Foshan, Guangdong

今すぐお問い合わせください

タイトルまたは説明

Usage and advantage of construction formwork:
it can formal the new pouring concrete and conserve it. So the temporary structure has to reach strength to withstand itself, and to remove the model formwork. The main advantage is making and assembling freely, especially fit for the complicated outer shape, small quantity concrete structure or construction work.  

Data Reference:

1. Hardness≧76.4HRR.(Standard:≧*8HRR)                  
2. Expand water absorb thickness
≦0.4%.(Standard:≦1%)

3. MOR≧*1.9Mpa.(Standard:≧*0Mpa)                        
4. MOE
≧3.*5×*0^3 Mpa.(Standard:≧***0Mpa)

5. Screw Holding Capability≧***0N.(National Standard:≧***0N)

 

●Specification  

Normal size: ***0****0**2mm(*4kg), ***0****0**0mm(*3kg), can produce thickness *0、*2mm and etc.

 

● Maintenance and storage
1. MAINTENANCE

A. No scrape or beat it by hard when using. Clean up The surface in time.

B. Empty space should stuff with similar materials after use or transfer.

C. Be careful of load and unload formwork and small components. No throw, toss, or pitch and take measures to protect form crash.

D. Small components should clean up and keep tidy.

 

2. STORAGE

A. According the formwork size to pile up on the cleared ground between the small pieces of wood prevent from damage. Suitable spaces of mall pieces of wood can avoid formwork form deformation and crash.

 

B. Formwork should keep well ventilated and prevent form the sun and erosion medium when long-term store.  

国: China
モデル番号: HX-003
离岸价格: Get Latest Price
ロケーション: Foshan,China
最低注文量の価格: -
最低注文量: 1000 Square Meter
パッケージの詳細: standard packing
納期: 20 to 30 days
供給能力: 100000 Square Meter per Month
支払いタイプ: L/C, T/T
製品グループ : WPC composite formwork

Send a direct inquiry to this supplier

To:

Ms. Chan < Foshan Nanhai Hengxing Plastic Building Material Co., Ltd >

私は知りたい: