离岸价格
Get Latest Price5534483 USD / Set
|1 Set Minimum Order
国:
China
モデル番号:
700t/d cement plant
离岸价格:
5534483 USD / Set Get Latest Price
ロケーション:
shanghai
最低注文量の価格:
5534483 per Set
最低注文量:
1 Set
パッケージの詳細:
10 40ft container, flat rack , open container
納期:
120working days
供給能力:
20 per Year
支払いタイプ:
T/T, L/C
製品グループ :
連絡先担当者 Mr. Wei
No.33 Shenxia Road, Malu Industrial Park, Jiading District, Shanghai
In short, limestone and other materials containing calcium,
silicon, aluminum and iron oxides are crushed and milled into a raw
meal.
This raw meal is blended and then heated in the pre-heating
system(cyclones) to start the dissociation of calcium carbonate to
oxide. The meal goes further into the kiln for heating and reaction
between calcium oxide and other elements to form calcium silicates
and aluminates at t a temperature up to ***0 centidegree: so called
clinker burning. The cyclone system is attached to the rotary kiln
by a riser duct. Secondary fuel is fed to the riser duct, the main
fuel mixture, coal/petcock, fires the kiln. Reaction products leave
the kiln as a nodular material called clinker. The clinker will be
interground with gypsum and other materials to
cement.
The equipments we use in this whole production
line are vibrating feeder, jaw crusher, impact crusher, cement ball
mill, lifer, preheating system, cement rotary kiln and packing
machine and so on. All the necessary equipments in this line can be
provided by our factory. We have cement
production line experts
to design specific solutions for your
preference.
After shipping the equipments to destination, if
you need help in the installation of all the equipments, we can
send our engineers to help settle the whole line!
国: | China |
モデル番号: | 700t/d cement plant |
离岸价格: | 5534483 / Set Get Latest Price |
ロケーション: | shanghai |
最低注文量の価格: | 5534483 per Set |
最低注文量: | 1 Set |
パッケージの詳細: | 10 40ft container, flat rack , open container |
納期: | 120working days |
供給能力: | 20 per Year |
支払いタイプ: | T/T, L/C |
製品グループ : | Cement Production Line |