No.33 Shenxia Road, Malu Industrial Park, Jiading District, Shanghai
The Clinker is procured from Clinker
Grinder Unit from
India, China, Indonesia, Gulf and European counties. The mined
Gypsum is available in local market. The additives are very
important and vary with application of Cement. Generally, Slag of
Iron Industry is used for making Slag Cement and Over Burnt Bricks
/ Fly ash from Thermal Power Plants are used to make Pozzolona
Cement. The additive is selected on the basis of availability,
economy and of course the demand of specialty Cement. All the raw
materials are tested in laboratory for the quality before
use.
All the raw materials are crushed with the help of Jaw Crusher if
they contain lumps. The feed size for the Cement Mill should be
less than 25 mm The raw materials are fed into their respective
hoppers with the help of Belt Conveyor Or elevators. The hoppers
are fitted with feeding systems which are connected with auto
measuring and control system(Weighing Trolley). The measured
quantity of raw material is discharged on a weighing Trolley/
conveyor belt. The weighing trolley/ conveyor belt carry the mixed
material to the discharge hopper. The material from discharge
hopper is taken to the elevator to feed into the Mill feed hopper.
The discharge of the feed hopper is controlled by an adjustable
speed rotary feeder. The feed of the mill can be varied as per the
requirement. The rotary feeder discharge the material in to the
Cement Mill. There are three chambers in the Mill. The chambers are
filled with grinding Media ( balls & Cylpebs). The material is
ground fine ( 3500 Cm2/gm.). The cement is discharged from the mill
to the elevator to fill it in the Storage / Aeration Silo. The silo
is fitted with compressed air coils. The air cools down the cement
in the silo. The cooled Cement is packed with the help of packing
machine in 50 Kg. Bags. The final product is tested from the bags
for the quality and quantity and other parameters as per the
statutory requirements provided by the Government.
国: | China |
モデル番号: | 50tph clinker grinding plant |
离岸价格: | 80000 ~ 205000 / Set ( Negotiable ) Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 80000 per Set |
最低注文量: | 1 Set |
パッケージの詳細: | big parts naked package, small parts wooden package |
納期: | 80days |
供給能力: | 35 Set per Year |
支払いタイプ: | - |
製品グループ : | Complete Set of Cement Machinery |