タイトルまたは説明
This gas booster system is a
newly designed model of pneumatic power unit which adopted the
United State’s pneumatic pressure principle and combined customer’s
specific requirements. It takes compressed air as the power source,
takes air operated booster as the pressure source, the drive air
pressure and output pressure are in a direct ratio. Through the
adjustment of the air supply can freely adjust the output pressure
value. When drive air pressure and output pressure reach to a
balance, gas booster will stop working automatically, and output
pressure will keep at a pre-adjusted level, if there is pressure
drops because of leakage, the booster will restart working
automatically to compensate the pressure. Through controlling the
quantity of pressure of air supply can realize the control of
the working frequency (CPM) of the booster, and thus to realize the
proper control of system output pressure.
The whole equipment has the merits of a framework structure,
compact design, light weight, simple operation, safety and
reliability.
Features and Benefits
l The
system takes air operated gas booster to pressurize. Through the
adjustment of the air supply can adjust the system pressure. The
ball valve is used for controlling the drive air supply and thus to
freely control the booster’s working conditions. The booster can be
shut down quickly when the pressure is reaching to the desired
value to avoid possible pressure overshooting.
l High
pressure booster pumps, valves, tubing and fittings made of
**6SSguarantee the
test precision and
stability.
l Air-operated
gas booster with special isolated packing makes no contamination to
mediums.
l Supplied
with safety valve, shut off valve, stainless steel tubing and
fittings etc.
l International
standard thread connections allow repeated and easy assembling and
disassembling.
l Adjustable
and wide range of output high pressure.
l Compact
design, convenient shift and low noise, easy operation and simple
maintenance.
Technical Specification:
1. Model:G****-M**0ï¼›
2. Pressure
output:MAX.***0PSI;
3. Displacement:*2.7cu.In/stroke
4. Medium:N2,
Air, H2 and other inert gases (No O2.)ï¼›
5. Gas
supply Pressure:*0psi≦P≦***0psi;
6. Driver
Air:*0psi≦P≦**0psi;
7. Conditions:
oil content:≤5ppm;
dew point :< 5°C;
flow rate:≥1.5NM3/min;
8. Dimension:**0mm×**0mm×**0mmï¼›
This set of device is mainly
consisted of pump-valve installing frame, which is filled with all
the valves, pipelines and so on. And the installation of pipeline
complies with the horizontal-vertical principle to create a
rational layout; all the pipelines are connected with stainless
steel pipes. The whole testing process can be achieved through the
control s/switches on the control panel.
1
Maintenance
(1) The operator must be
trained and know well with the working principle, operating
procedures and daily maintenance;
(2)
The water in the air filter should be removed promptly, turn on the
at bottom of the air filter, can remove the water under a
certain pressure;
(3) The gases or air must be
clean. And the pipeline filters should be cleaned
regularly;
(4)
The joints may become loose because of the shakings when
transporting and working. So please check the joints to avoid the
leakages occasionally;
(5)
Keep equipment clean and tidy;
(6) Prevent high temperature,
dust, corrosive media, water and etc. to invade the
system;
(7)Periodic inspection, keep
all parts and elements completely.
(8) Keep the clamps and fittings
dry (if it has);
(9) Make sure the drive air
source is dry and clean in order to preventing the possible damages
from seal parts of booster or check valves, etc.
2safety guide
1) Security
rules should be strictly fulfilled by operators. And supervisors
should be available as well.
2) For
H2 boosting within its capability, the operations of the valves
shall be done slowly, the
working frequency of booster shall be as slowly as possible to
avoid possible burning of H2;
3) Check
the connections of all the pipeline regularly to avoid leakage of
H2;
4) for
H2 boosting, check the breather of booster first, the specific
operations as following:
a. Turn on the valve of H2 cylinder, and filling H2
into the booster system and keep it on non-working
status;
b. Remove the breather and, stuff up the connecting
pipe by fingers;
If the leakage of gases can be felt
obviously (press increased on your fingers), that means the seal
parts of gas booster was abraded, and H2 has been leaking, please
turn off the hydrogen cylinder immediately. And ventilate the
testing site such as by opening the doors and windows.
Please contact with the supplier for
the further services, it’s forbidden to remove or maintain it by
the non-professionals, or to replace any non-standard
components;
5) For
charging cylinders or pressure vessels, if you don’t want the
residual air of pipelines to get into the pressure vessels, please
exhaust the air by unloading valve. Shown as follow:
a. Connect the gas source vessel with the filling
cylinder well, and make sure the valves of them are
closed.
b. Open the valve of gas source cylinder, and then
the gases will flow into the pipelines of gas booster
system;
c. Slowly turn on the unloading valve for **5 seconds
to vent the residual air;
d. Turn off the unloading valve and, turn on the
valve of filling cylinder, to start the charging
operations.
国: |
China |
モデル番号: |
G3032-M-50
|
离岸价格: |
(交渉可能)
Get Latest Price
|
ロケーション: |
China |
最低注文量の価格: |
- |
最低注文量: |
1 Set |
パッケージの詳細: |
wooden case |
納期: |
8-10 weeks |
供給能力: |
100 Set per Year |
支払いタイプ: |
T/T, L/C |
製品グループ : |
- |