离岸价格
Get Latest Price800 ~ 1000 / Ton
|1 Ton Minimum Order
国:
China
モデル番号:
MIDAS004
离岸价格:
800 ~ 1000 / Ton Get Latest Price
ロケーション:
-
最低注文量の価格:
800 per Ton
最低注文量:
1 Ton
パッケージの詳細:
in bulk or 20', 40' containers
納期:
25 days after order
供給能力:
100000 Ton per Month
支払いタイプ:
PayPal, D/P, L/C, T/T
製品グループ :
Specifications:
1) The standard of pipe: ISO 2531 - 1998, EN545-2002 ,
K9
2) Effective length: 6M when using bulk shipment way, or
about 5.5M or 5.7M when
in 20' container shipment way
3) Inner cement line: Portland cement line as per
ISO4179
4) Zinc coating: at least 130gsm as per ISO 8179
5) Bitumen painting: at least 70um as per ISO
8179
6) Gaskets are NBR rubber, natural rubber, SBR rubber or
EPDM rubber
tightness ring as per ISO4633
7) DN 80 - 1,600 mm
8) High strength, lighter than gray iron, good
corrosion resistance, no furring,
small flow resistance, easy fixing, long life
time
9) Checked by automatic inspection equipment
10) Composition:
a) C: 3.4 - 3.7%
b) Si: 2.0 - 2.4%
c) P: < 0.08%
d) S: < 0.015
11) Pull strength: >420MPa
12) Yield: >10%
13) Hardness: < 230HB
14) K type mechanical joint with flange and bolts
available
15) Process and testing:
a) Blast furnace (Analysis of raw materials test
)
b) Mg treatment (Micro & chemical composition
test)
c) Pipe spinning (Temperature test)
d) Heat treatment (Micro structure; Flattening
test)
e) Zinc coating (Thickness testing)
f) Dimensional checks (Thickness & Dia.
testing)
g) Hydraulic test (Pressure test)
h) Internal lining (Thickness testing)
i) External coating (Thickness test)
Mechanical joint pipe and fittings are also available.
Packing: in bulk or 20' container
国: | China |
モデル番号: | MIDAS004 |
离岸价格: | 800 ~ 1000 / Ton Get Latest Price |
ロケーション: | - |
最低注文量の価格: | 800 per Ton |
最低注文量: | 1 Ton |
パッケージの詳細: | in bulk or 20', 40' containers |
納期: | 25 days after order |
供給能力: | 100000 Ton per Month |
支払いタイプ: | PayPal, D/P, L/C, T/T |
製品グループ : | ductile iron pipe |