FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
12, 500MT
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
10, 000, 000MT
Payment Type:
-
South Korea
連絡先担当者 Mr. kwak
SerGu, TaeJeon, S.Korea
Dear Ser/Madam: How are you? We contact with very true and serious CEMET(OPC *2.5) manufacture seller and qutation transaction. 1. Commodity : CEMENT(OPC*2.5) 2. ORIGIN: SPAIN 3. PRICE(*2.5R/N) ***0.**0 MT/ *2.**0MT: $ *8 ***0.**0 MT/ *5.**0MT: $ *7 ***0.**0 MT/ *0.**0MT: $ *5 ***0.**0 MT/ *5.**0MT: $ *4 *1.2 Mio MT/**0.**0MT: $ *2 *1.8 Mio MT/**0.**0MT: $ *2 *2.4 Mio MT/**0.**0MT: $ *0 *3.6 Mio MT/**0.**0MT: $ *9 *4.8 Mio MT/**0.**0MT: $ *8 *6.0 Mio MT/**0.**0MT: $ *6 **2.0 Mio MT/1, **0.**0MT:$ *1 **1. OPC*2.5 : ADD USD5, OPC *2.5 : -USD5 **2. SABS certified cement:ADD $ 7.0 4. PAYMENT TERM: *****, Non-Transferable, Auto Revolving, Assignable and Terms Confirmed Documentary Letter of Credit covering the monthly shipment quantity of XXX Metric Tons (+/*5%). Payable **0% at sight B. Payment for every shipment via T/T with one month BG as a guarantee. 5. Procedure (non negotiable): ***** original documents from buyer! **2.Buyer sends LOI (ICPO) + BCL **3.Seller sends FCO or Contract. **4. Buyer sends FCO or Contract with date, stamp and signature back to the Seller. **5. Seller sends Draft Contract or Final Contract to the Buyer! **6. The remaining steps to conclude the transaction are contract specific and are described in detail in each Contract. 6. standard and specification: -United States Standard ASTM C **0 or -British Standard BS *2/***6 or -Russian Standard GOST ******5 -Euro Standard EN **7/2 Note : Factory visit allow after contract. If you notify LOI and BCL, we can contract preferentially. please contact oku**5 (at)hotmail(DOT)com Wait good reply. RGDS