FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
連絡先担当者 Mr. Andy
NO.889 West of Beijing road ,, Qingdao, Shandong
PE pipe production line Close type corrugator and vacuum for forming Forming module is moving in a tunnel Forming tunnel is clod by water Forming module is made of hard alloy steel and anti-corrosion and abrasion. No any connection between forming module, the reduce time to change. Provide single sand double wall corrugation pipe head die.