FOB Price
Get Latest Price20 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
bubble bag and regular carton
Delivery Time:
3 weeks
Supplying Ability:
300000 Piece per Month
Payment Type:
D/P, D/A, L/C, T/T
連絡先担当者 Ms. Eileen
No45 Room A510-512, Automobile Mansion, No.45 Zhenhua Road, Futian District, Shenzhen, Guangdong
Supplier:Shenzhen Grande Electronics
Layers:4
Application:Welding Machine Quick PCB Assembly-
HASL No MOQ
PCB:FR4/1.6mm/1oz
Min Via:0.2mm
Surface Treatment:HASL
PCBA Lead time:**4 weeks
Testing:**0% E-test
Standard Warp:
Â
[Description]
1,Turnkey solution forWelding Machine Quick PCB Assembly- HASL No
MOQ
2, PCB Assembly, PCB fabrication / PCB layout, PCB Reversing.
3, Full Bespoke PCBA/ OEM/ EMS(Electronics Manufacturing
Services).
4, SMT&DIP&PTH&BGA.
5, Components Sourcing.
6, Quick PCBA prototype.
7, X-ray test, ICT and Functional Circuit Test.
8, Sample and small batch order are accepted.
PCBA Service
Customer offers: Gerber file, PCB Specification, BOM and Assembly
Drawing.
Full-turnkey PCBA: ***0Layers PCB, Components Sourcing, SMT, PCBA
testing, PCBA Aging test, PCBA Packing and PCBA Shipping.
PCBA Quality Assurance
1, Certifications: UL, SGS, TUV, BV, ROHS, ISO***1: ***8, TS****9:
***8
2, 7 lines dust-proof SMT lines and DIP lines.
3, All line works wear anti-static and dust-proof clothing.
4, All operators should pass strictly training before they start
work.
5, SMT Equipment:solder paste printer in Jidakang,, Mounter in
Panasonic, Re-flow, Wave Soldering, Semi-auto DIP
6, PCBA Test Equipment: ORT, Constant temperature and humidity
chamber,3D CMM,X-Ray.
7, PCBA Test:ICT, Functional Circuit Test and X-ray test.
8, Package Processed:
***2, ***3, ***5, ***6, ***8, ***5, ***6
Micro QFP 0.2mm
Flip-chip, BGA, Connectors
BGA Ball Pitch=0.2mm
9, Each workstation in accordance with the SOP
*0, Materials:FR*4, FPC, Aluminum,High TG,Halogen-Free, HF, CEM*1,
CEM*3, FR*1, **-V0 and so on.
*1, Material Brand:KB, SHENGYI, NANYA and so on.
PCBA Lead Time
PCBA prototype: ***0 working days after contract signed and EQ
confirmed.
Mass production: partial delivery according to the customers
requirement.
Other information for PCBA
1, The mass production will be arranged after PCBA prototype
confirmed.
2, Use Teflon adhesive tape to protect Mount Holes and GND
Holes.
3, EPE is used to avoid impact and crash.
PCBA Standard Packing
Anti-static bag andcompartmental packing