FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
連絡先担当者 Mr. Sunny
4F.Building 9, Jiu-Xiang-Ling Industrial Park, shenzhen, Guangdong
Project Location:Tsinghua University, Shenzhen Graduate School. China Construction time:Dec. ***9 Project Introduction:power of solar PV modules:*3kW solar grid-connected inverter model:GB***0B*3. The solar trees are built on the glass of the landscape to form the solar power forest to absorb the energy from the sun and part of the power is transmitted to the power grid while the other part is stored for the power of public facility of the school. Annual output of generated electricity :*4MWh