あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。
今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell epoxy industrial terra paints

Sell epoxy industrial terra paints

FOB Price

Get Latest Price

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. hongyou

No. 9, Longyun Road, Jingwei Industrial Zone, Beifang Town, Beijing, Beijing

今すぐお問い合わせください

Description

ALLIED RONGDA RE**1 Ordinary epoxy floor paint systems  Application Terrazzo and cement floors in workshops of producing electrical equipment、electronics、machinery、foodstuff、medicine、chemical industry, tobacco, feedstuff, textile, clothing, furniture, plastic, sports supplies .etc.  Performance characteristics • Dust proofï&frac*4;Œdamp proofï&frac*4;Œantisepsis and wear-resisting • Advantageous for cleanly, Prompt Constructionï&frac*4;ŒEasy maintenance and low in price • Strong adhesion, good flexibility and resistant to impact • Thickness is 0.**0.8 mm  Service life General for **5 years  Construction process • Basic processing • Brushwork closed primer • Puttying • Polish and dustarrest • Painting surface with roller  Raise Open time for forty-eight hours to walk and Seven days after use RE**3 Color Sand Epoxy Floor Coating System  Application Required wear resistance, impact strength, good decorative effect, with certain non-slip floor function, especially for airports, shopping malls, exhibition halls, subway, telecommunications, health care, senior entertainment, food production seriously look clean , durable good place.  Performance characteristics • Colorful and rich in good decorative effect • Clean, no connection traces • Abrasion resistance, acid and alkali and Prevent mildew, bacteria produce  Service life General for *5 years  Construction process  Basic processing  Brushwork closed primer  Epoxy Color Sand mortar laying  Press polish by Mechanical  Painting Transparent coating RE**5 Anti-static Epoxy Floor Coating System  Application Electronics, microelectronics, communications, computer, textile, printing, precision electronics, powder, chemicals, organic solvents, gas, oil tanks of all necessary anti-static factory walls, floor, etc.  Performance characteristics • Excellent durable anti-static effect, regardless of time, temperature, humidity • Dust proofï&frac*4;Œdamp proof and wear-resisting • The surface is smooth, corrosion-resistant  Service life Generally more than 5 years  Construction process  Basic processing  Brushwork closed primer  Laying copper wire and Cutting groove  Painting conduction Middle paint  Polish and dustarrest  Trowelable anti-static coatings RE**6 Anti-slip Epoxy Floor Coating System  Application Request wear-resistant and certain impact resistance of electrical appliances, electronics, machinery, communication equipment, instrumentation, food, medicine, chemical manufacturing, especially the need to run cars, trucks, and heavy handcart footpath  Performance characteristics • Resistant to impact, good hardnessï&frac*4;Œpeakload • Can be used non-slip floor、matt or high gloss surface • Dust proofï&frac*4;Œdamp proofï&frac*4;Œantisepsis and wear-resisting • Thickness is **3mm  Service life General for ***0 years  Construction process  Basic processing  Brushwork closed primer  Painting epoxy mortar  Puttying  Polish and dustarrest  Painting surface with roller RD-F**1 Self-leveling cement  Product Introduction RD-F**1 Self-leveling cement is made up of special cement、binders and various additives, Using European technology to produce dry mix mortar , in the fresh state can be auto-leveling of the ground material.  Application For housing, hospitals, supermarkets and other public buildings and light ground floor room and the grassroots strength of not less than *0Mpa. After leveling the ground can be tiled、PVC flooring and wool carpets、synthetic fiber carpets、terrazzo and a variety of wood flooring.  Environmental and Safety • low-alkali • Anti-alkaline layer • Casein free and Harmless • No radiation • No noxious fumes RD-F**1 Self-leveling cement  Product Introduction RD-F**1 Self-leveling cement is made up of special cement、binders and various additives, in the fresh state can be auto-leveling of the ground material. This product is premixedï&frac*4;Œ mixing with water in the field can be used ï&frac*4;ŒConstruction can be manually or use pumping machinery  Application For housing, hospitals, supermarkets, parking, cars gallery and other public buildings and light ground floor room and the grassroots strength of not less than *0Mpa. After leveling the ground can be tiled、PVC flooring and wool carpets、synthetic fiber carpets、terrazzo 、 a variety of wood flooring and epoxy topcoat.  Environmental and Safety • Law-alkali • Anti-alkaline layer • Recyclable materials • No radiation • No noxious fumes • Casein free and Harmless RDJ-SL Ground treatment agent 【Application】 • Closed treatment to Cement-based self-leveling on primary floor • Improve the cementation of self-leveling and grass-roots • Improve the mobility of self-leveling materialsï&frac*4;Œimprove the ability of shakeout 【Characteristics】 • Closed effective • Antistripping • Good construction 【Usage】 • Check the ground and confirm the ground dry and flat. • Check the hardness of the ground, and confirm the ground should be no cracksï&frac*4;Œ holes to fill on the foundation ï&frac*4;Œcram in the floor drain with plug , especially the uneven places to be filled with mortar can be flattened with a grinding machine. • Clean dust of grass-roots, loose concrete surface, oil cement, carpet glue, and magazines that may affect the bond strength of clean. Fully polished surface. • Clean dust thoroughly • Painting RDJ-SL ground treatment agent twice on the clean grassrootsï&frac*4;Œfirst pass the RDL-SL ground treatment agent and water mass ratio of 1:1 diluted in accordance with brushing the groundï&frac*4;Œthe first layer dry and then brush againï&frac*4;ŒRD Series self-leveling cement materials can be mixed construction after the second layer dry. Construction Instructions of RD Series self-leveling cement Basic Treatment • Check the ground and confirm the ground dry and flat. • Check the hardness of the ground, and confirm the ground should be no cracksï&frac*4;Œ holes to fill on the foundation ï&frac*4;Œcram in the floor drain with plug , especially the uneven places to be filled with mortar can be flattened with a grinding machine. • Clean dust of grass-roots, loose concrete surface, oil cement, carpet glue, and magazines that may affect the bond strength of clean. Fully polished surface. • Clean dust thoroughly • Use of special RDJ-SL interface agentï&frac*4;ˆsee RDJ-SL interface agent specificationï&frac*4;‰ï&frac*4;Œevenly applied twice at the grassroots levelï&frac*4;Œin the first pass the basic dry, brush a second timeï&frac*4;Œto be the second time dry with slightly stickyï&frac*4;Œ can be casting construction.  Mixing Self-leveling cement has uniform premixedï&frac*4;Œa bag into a bucket with 6~6.*5 kilograms of clean waterï&frac*4;ˆSpecific amount of water requested to packaging bagsï&frac*4;‰ï&frac*4;›use electric drill for mixingï&frac*4;Œuntil the formation of a mixture of uniform flowï&frac*4;Œmust ensure that no lumps.  Construction The mixed slurry to a uniform lying on the groundï&frac*4;Œleveling with a scraper supportingï&frac*4;Œdefoaming with defoaming rollï&frac*4;Œwhen larger wear spikes set into the construction ï&frac*4;Œof the partition line depending on the circumstancesï&frac*4;Œslurry used within *0 minutes  Raise Self-leveling cement about *4 hours after drying completelyï&frac*4;Œ1~2 days after laying the floor.  Attentions Surface temperature below 5℃ can not be self-leveling cement for construction. Above the drying time at room temperature for *0℃ï&frac*4;Œapplicable under normal conditions. The drying time due to low temperature, high humidity and extended. Construction of the optimal temperature should be controlled at *0~*0℃  Preparation Tools • Surface grinding machineï&frac*4;ˆï&frac*4;œ***0Wï&frac*4;‰ï&frac*4;šLarge grass-roots pre-treatment and Self-leveling grinding. • Hand hold grinderï&frac*4;šRubbed off a small area of high part and raised of the floor or caking. • 2 m floor detectorï&frac*4;šFloor flatness testing • Vacuum Cleanersï&frac*4;šClean floor • Mixerï&frac*4;ˆhigh-power、slow-speed of revolutionï&frac*4;‰ï&frac*4;šSelf-leveling with special mixing head to mix • Special toolsï&frac*4;šSpecial self-leveling scraper、defoaming roll、spikes • Otherï&frac*4;šinterface agent rollï&frac*4;Œ*0 liter mixing bucketï&frac*4;ŒVolume bucketsï&frac*4;Œetc. RDJ*3 coiled-material floor glue  Application Mainly used for civil, commercial and industrial buildings interior plastic coiled material surface, the fabric backing, foam backing on the floor.  Characteristics • Coating of large area • High initial viscous forceï&frac*4;Œlaying on the floor difficult to shift or lifting edge • Easy to work • Environment-friendly productsï&frac*4;Œnon-irritating smell • High initial viscous force and ending viscous force of caking ability. • Able to resist the extrusion of chair or casters • Applies to the ground of heating system  Usage • The grassroots surface must be clean and strong, dry, no structural cracks and other defects. No things will affect bond: the surface with high Porosity, low strength and powder surface must be painted a layer first with the use of multifunctional interface agent of RONGDA. Uneven grassroots should make it even by cement self-leveling. The new pouring grassroots or bottom of concrete must make its moisture content checked. Moisture insulation must be done to the surface water and residual moisture with high content. RONGDA water proof material can be used in this process. • Choose A2, A3 or B1 serrated blade to coat uniformity. Coating does not require too much glue as long as the floor covering on the line, and pasting in the products working hours. • According to primary porosity and the temperature and humidity at construction site, dry about *0 – minutes, then covered with floor, and compact the floor with heavy mental roller in the weight from *0㎏to*0㎏ to remove the air under the floor, a good effect can be achieved. • After*4 ~ *8 hours people can walk on the floor ï&frac*4;Œultimate strength time: about *2 hours. • Please refer to the related construction materials of the floor suppliers before laying the floor.  Theoretical coating amount • About 2.8 ~4㎡∕㎏ • Cool time: about *0 ~*5 minutes; working time: about *0 ~*0 minutes • Time of people can walking on: after*4 ~ *8 hours, ultimate strength time: about *2 hours.  Shelf Life  *5kg plastic bucket; Shelf Life is 6 months Construction specifications of RDJ*3 coiled-material floor glue RDJ*3 coiled-material floor glue is a solvent-free binder of high quality copolymer emulsion. It is applicable to all kinds of roll and piece floors of plastic including homogeneous plastic floor, skid-proof floor and sound proof floor with form-back: also applies to the thermoplastic or semi- flexible piece floor with filled inorganic, Household plastic flexible floor, polyolefin floor, and blanket and door mat with back lining, etc. Please follow these instructions:  Foundation treatment • The grassroots surface must be clean and strong, dry, no structural cracks and other defects. No things will affect bond: the surface with high Porosity, low strength and powder surface must be painted a layer first with the use of multifunctional interface agent of RONGDA. Uneven grassroots should make it even by cement self-leveling. • The new pouring grassroots or bottom of concrete must make its moisture content checked. Moisture insulation must be done to the surface water and residual moisture with high content. RONGDA water proof material can be used in this process.  Coating • Choose A2, A3 or B1 serrated blade to coat uniformity. Coating does not require too much glue as long as the floor covering on the line, and pasting in the products working hours. • According to primary porosity and the temperature and humidity at construction site, dry about *0 – minutes, then covered with floor, and compact the floor with heavy mental roller in the weight from *0㎏to*0㎏ to remove the air under the floor, a good effect can be achieved. • Please refer to the related construction materials of the floor suppliers before laying the floor.  Theoretical coating amount • About 2.8 ~4㎡∕㎏ • Cool time: about *0 ~*5 minutes; working time: about *0 ~*0 minutes • Time of people can walking on: after*4 ~ *8 hours, ultimate strength time: about *2 hours.  Notes To ensure good ventilation and optimal temperature and humidity needed in construction. Low or high temperature will prolong the drying time and delay the development of bond strength. The floor should not be used excessively before the adhesive strength of the floor is fully achieved. GFVC*1 ground anticorrosive mortar  Application • Warehouse floor of anti-corrosion • Protection of sewage pool and drainage ditch under Corrosive environment • Power plant, chemical, food, tobacco, and other industries workshop of anti-corrosion  Characteristic • Excellent corrosion resistanceï&frac*4;šResistant acid, alkali, organic solvents of erosion • Easy to constructionï&frac*4;šHigh integrity, smooth seamless, no special maintenance • Early strength and high strengthï&frac*4;š7 days after pouring can be deliver used • Anti-strippingï&frac*4;šCombination of old and new interface immobility • Resistant Oil permeabilityï&frac*4;šDense impervious can adapt oil environment • Good wear resistanceï&frac*4;šWear-resistant, dustproof, durable  Usage A 、B and C into three groups were in according to the proportion of mix into mortar can be constructionï&frac*4;ˆplease see construction specifications of GFVC*1 ground anticorrosive mortarï&frac*4;‰  Storage Moisture-proof packagingï&frac*4;ŒDry storage **6 months in ***0℃ï&frac*4;ˆSpecial packaging shelf life of up to1 yearï&frac*4;‰ï&frac*4;›A、B and C Three groups should not be confused during storage GFVC*2 Metope Anti-corrosion mortar  Application • Chemical water system in Power plantï&frac*4;ŒAnti-corrosion wall of the main plant condensate water regeneration • Chemical plants, sewage treatment plants and other wall of anti-corrosion • Paper mill, pharmaceutical and other types wall of anti-corrosion  Characteristic • Excellent corrosionï&frac*4;Œsolvent and chemical resistance • Resistant to moisture、excellent anti-fouling abilityï&frac*4;Œcan be used cleaners to scrub • Easy to construction and high integrityï&frac*4;Œcan be instead of plastering mortar to overcome the second bond is not strong the disadvantages • Easy maintenance  Usage A 、B and C into three groups were in according to the proportion of mix into mortar can be constructionï&frac*4;ˆplease see construction specifications of GFVC*2 metope anticorrosive mortarï&frac*4;‰  Storage Moisture-proof packagingï&frac*4;ŒDry storage **6 months in ***0℃ï&frac*4;ˆSpecial packaging shelf life of up to1 yearï&frac*4;‰ï&frac*4;›A、B and C Three groups should not be confused during storage GFVC*3 Ditch、pond and runner anti-corrosion mortar  Application • Thermal power plants diversion runnerï&frac*4;ŒCorrosive medium circulating of water pump house • Thermal power plants、chemical plant of oxidation pond、aeration tank or acid bath、wastewater disposal basin、inner wall and top of pond anti-corrosion mortar floor • Various drains, dosing trench and underground facilities、geosyncline  Characteristic • Excellent the basic binding force • Resistant to concrete and wet corrosion under a variety of media • Outstanding water resistance • Media to coating time of break-through ten times slower than the granite  Usage A 、B、C into three groups were in according to the proportion of mix into mortar can be constructionï&frac*4;ˆplease see Construction specifications of GFVC*3 Ditch、pond and runner anti-corrosion mortarï&frac*4;‰  Storage Moisture-proof packagingï&frac*4;ŒDry storage **6 months in ***0℃ï&frac*4;ˆSpecial packaging shelf life of up to1 yearï&frac*4;‰ï&frac*4;›A、B、C Three groups should not be confused during storage GFVC*4 Ceiling Anti-corrosion planting  Application • Chemical water system in Power plantï&frac*4;ŒAnti-corrosion ceiling of the main plant condensate water regeneration • Chemical plants, sewage treatment plants and other ceiling of anti-corrosion • Paper mill, pharmaceutical and other types ceiling of anti-corrosion  Characteristic • Excellent corrosionï&frac*4;Œsolvent and chemical resistance • Resistant to moisture、excellent anti-fouling abilityï&frac*4;Œcan be used cleaners to scrub • Easy to construction and high integrityï&frac*4;Œcan be instead of plastering mortar to overcome the second bond is not strong the disadvantages • Easy maintenance  Usage A 、B into two groups were in according to the proportion of mix into mortar can be constructionï&frac*4;ˆplease see Construction specifications of GFVC*3 Ditch、pond and runner anti-corrosion mortarï&frac*4;‰  Storage Moisture-proof packagingï&frac*4;ŒDry storage **6 months in ***0℃ï&frac*4;ˆSpecial packaging shelf life of up to1 yearï&frac*4;‰ï&frac*4;›A、B two groups should not be confused during storage RE-S Epoxy mortar  Application Rapid repair of roads and bridges  Characteristic • Early strength and high strengthï&frac*4;š3 hours at room temperature curing strength up to *0MPa • Anti-strippingï&frac*4;šCombination of old and new interface immobilityï&frac*4;Œgood stretching and high-tensile • Good wear resistanceï&frac*4;šWear-resistant, dustproof, durable • Easy to constructionï&frac*4;šHigh integrity, smooth seamless, no special maintenance • Resistant Oil permeabilityï&frac*4;šDense impervious can adapt oil environment  Usage A 、B、C into three groups were in according to the proportion of mix into mortar can be constructionï&frac*4;ˆplease see Construction specifications of Epoxy mortarï&frac*4;‰  Storage Moisture-proof packagingï&frac*4;ŒDry storage **6 months in ***0℃ï&frac*4;ˆSpecial packaging shelf life of up to1 yearï&frac*4;‰ï&frac*4;›A、B、C Three groups should not be confused during storage Construction specifications of GFVC*1 ground anticorrosive mortar GFVC*1 ground anticorrosive mortar is premix. Just need to mix A, B, C three components in proportion when in use, construction can be done right after stirring well. The detailed operating methods are as follows: Foundation treatment Treatment of Concrete base: first chisel the surface of the base, then clean the dust and debris on the surface. The surface of Grass-roots demands leveling and sgraffito, and it must be dry (moisture content is less than6%), clean without oil and dirt. Treatment of steel base: derust the surface of steel plate, clean up oil and other debris and layout steel wire or plum nail according to the requirements of design. If the plum nails are used, the distance between the nail and nail should be about **0 mm **0 mm, and the height of nails should be about *0% of the thickness of working surface. Mixing A, B, and C components of anticorrosive mortar have been packaged in proportion. When under construction, first mix A, B components uniformly in proportions at, and mixing time should be controlled in **3 minutes. Then add the C components in proportions, and mix **3minutes. There are the products that can meet the construction requirements. Application  Application is on the ground: Spread the ground with mixed GFVC anticorrosive mortar in a certain thickness and make the surface level with leveling instrument, then vibrate to compaction with a plate vibrator and spread and smooth with a trowel.  Surface layer after GFVC anticorrosive mortar mix up ï&frac*4;Œand then rolling brush with a brush or roller Application Notes • Application site must be ventilated, and smoking and lighting fires are strictly forbidden. Not application in the weather of snow, ice, fog and rain. • Application materials must be planned, made up in proportions at any time of using, and used up within half an hour. Besides, the remaining material cannot be poured back into the original barrel. • the ambient temperature on application site should be higher than 5℃, and relative humidity should be less than *5%. • Constructors should record the application position ﹑application time﹑humidity﹑relative humidity﹑surface treatment of grade level , and actual consumption of materials to prepare for verification. • Different components must be stored isolated, and mixing them together is strictly forbidden. The storage period is one year. Construction specifications of GFVC*2 metope anticorrisive mortar GFVC*2 metope anticorrosive mortar is premix. Just need to mix A, B, C three components in proportion when in use, application can be done right after stirring well. The detailed operating methods are as follows: Foundation treatment • Treatment of Concrete base: first chisel the surface of the base, then clean the dust and debris on the surface. The surface of Grass-roots demands leveling and sgraffito, and it must be dry (moisture content is less than6%), clean without oil and dirt. • Treatment of steel base: derust the surface of steel plate, clean up oil and other debris and layout steel wire or plum nail according to the requirements of design. If the plum nails are used, the distance between the nail and nail should be about **0 mm **0 mm, and the height of nails should be about *0% of the thickness of working surface. Mixing A, B, and C components of anticorrosive mortar have been packaged in proportion. When under application, first mix A, B components uniformly in proportions at, and mixing time should be controlled in **3 minutes. Then add the C components in proportions, and mix **3minutes. There are the products that can meet the application requirements. Application • Application is on the metope: mix A and B components of GFVC acid and alkali-resistant motar premier coating well, then roll and spray with a roller and brush for one time. • after*2 to *0 hours natural solidification of first coat, mix A and B components of GFVC acid and alkali-resistant motar coatings well, then add parts of C components and stir well again. At last, scrape it to the specified thickness with a scraping plate. • mix A and B components of GFVC acid and alkali-resistant motar coating well, and roll and spray with a roller and brush for one or two time. Application Notes • Application site must be ventilated, and smoking and lighting fires are strictly forbidden. Not application in the weather of snow, ice, fog and rain. • Application materials must be planned, made up in proportions at any time of using, and used up within half an hour. Besides, the remaining material cannot be poured back into the original barrel. • The ambient temperature on application site should be higher than 5℃, and relative humidity should be less than *5%. • Constructors should record the application position ﹑application time﹑humidity﹑relative humidity﹑surface treatment of grade level , and actual consumption of materials to prepare for verification. • Different components must be stored isolated, and mixing them together is strictly forbidden. The storage period is one year. Construction specifications of GFVC*3 Ditch、pond and runner anti-corrosion mortar GFVC*3 Ditch、pond and runner anti-corrosion mortar is premix. Just need to mix A, B, C three components in proportion when in use, application can be done right after stirring well. The detailed operating methods are as follows:  Foundation treatment • Treatment of Concrete base: first chisel the surface of the base, then clean the dust and debris on the surface. The surface of Grass-roots demands leveling and sgraffito, and it must be dry (moisture content is less than6%), clean without oil and dirt. • Treatment of steel base: derust the surface of steel plate, clean up oil and other debris and layout steel wire or plum nail according to the requirements of design. If the plum nails are used, the distance between the nail and nail should be about **0 mm **0 mm, and the height of nails should be about *0% of the thickness of working surface.  Mixing A, B, and C components of anticorrosive mortar have been packaged in proportion. When under application, first mix A, B components uniformly in proportions at, and mixing time should be controlled in **3 minutes. Then add the C components in proportions, and mix **3minutes. There are the products that can meet the application requirements.  Application • Application is on the wall and trenchwall: mix A and B components of GFVC acid and alkali-resistant motar premier coating well, then add parts of C mixed at last to scrape it with a scraping plate. • Repeat the first process. Make GFVC acid and alkali-resistant motar premier coating reach the specified thickness ï&frac*4;Œ*4 hours of natural drying • Mix A and B components of GFVC acid and alkali-resistant motar premier coating well, then add parts of C mixed at last to scrape it with a scraping plate. • Surface layer after GFVC anticorrosive mortar mix up ï&frac*4;Œand then rolling brush with a brush or roller  Application Notes • Application site must be ventilated, and smoking and lighting fires are strictly forbidden. Not application in the weather of snow, ice, fog and rain. • Application materials must be planned, made up in proportions at any time of using, and used up within half an hour. Besides, the remaining material cannot be poured back into the original barrel. • The ambient temperature on application site should be higher than 5℃, and relative humidity should be less than *5%. • Constructors should record the application position ﹑application time﹑humidity﹑relative humidity﹑surface treatment of grade level , and actual consumption of materials to prepare for verification. • Different components must be stored isolated, and mixing them together is strictly forbidden. The storage period is one year. Construction specifications of GFVC*4 Ceiling Anti-corrosion planting GFVC*4 Ceiling Anti-corrosion planting is premix. Just need to mix A, B, C three components in proportion when in use, application can be done right after stirring well. The detailed operating methods are as follows:  Foundation treatment • Treatment of Concrete base: first chisel the surface of the base, then clean the dust and debris on the surface. The surface of Grass-roots demands leveling and sgraffito, and it must be dry (moisture content is less than6%), clean without oil and dirt.  Mixing A, B, and C components of anticorrosive mortar have been packaged in proportion. When under application, first mix A, B components uniformly in proportions at, and mixing time should be controlled in **3 minutes. There are the products that can meet the application requirements.  Application • Application is on the ceiling: mix A and B components of GFVC*4 acid and alkali-resistant motar premier coating well, then roll and spray with a roller and brush for one time. • Repeat the first process. Make GFVC*4 acid and alkali-resistant motar premier coating reach the specified thickness ï&frac*4;Œ*4 hours of natural drying • Mix A and B components of GFVC*4 acid and alkali-resistant motar coating well, and roll and spray with a roller and brush for one or two time. • Mix A and B components of GFVC*4 acid and alkali-resistant motar coating well, and roll and spray with a roller and brush for one or two time.  Application Notes • Application site must be ventilated, and smoking and lighting fires are strictly forbidden. Not application in the weather of snow, ice, fog and rain. • Application materials must be planned, made up in proportions at any time of using, and used up within half an hour. Besides, the remaining material cannot be poured back into the original barrel. • The ambient temperature on application site should be higher than 5℃, and relative humidity should be less than *5%. • Constructors should record the application position ﹑application time﹑humidity﹑relative humidity﹑surface treatment of grade level , and actual consumption of materials to prepare for verification. • Different components must be stored isolated, and mixing them together is strictly forbidden. The storage period is one year. Construction specifications of Epoxy mortar Epoxy mortar premix. Just need to mix A, B, C three components in proportion when in use, application can be done right after stirring well. The detailed operating methods are as follows:  Foundation treatment • Treatment of Concrete base: first chisel the surface of the base, then clean the dust and debris on the surface. The surface of Grass-roots demands leveling and sgraffito, and it must be dry (moisture content is less than6%), clean without oil and dirt. • Treatment of steel base: derust the surface of steel plate, clean up oil and other debris and layout steel wire or plum nail according to the requirements of design. If the plum nails are used, the distance between the nail and nail should be about **0 mm **0 mm, and the height of nails should be about *0% of the thickness of working surface.  Mixing A, B, and C components of Epoxy mortar have been packaged in proportion. When under application, first mix A, B components uniformly in proportions at, and mixing time should be controlled in **3 minutes. Then add the C components in proportions, and mix **3minutes. There are the products that can meet the application requirements.  Application • Spread the ground with mixed RE-S Epoxy mortar in a certain thickness and make the surface level with leveling instrument, then vibrate to compaction with a plate vibrator and spread and smooth with a trowel.  Application Notes • Application site must be ventilated, and smoking and lighting fires are strictly forbidden. Not application in the weather of snow, ice, fog and rain. • Application materials must be planned, made up in proportions at any time of using, and used up within half an hour. Besides, the remaining material cannot be poured back into the original barrel. • The ambient temperature on application site should be higher than 5℃, and relative humidity should be less than *5%. • Constructors should record the application position ﹑application time﹑humidity﹑relative humidity﹑surface treatment of grade level , and actual consumption of materials to prepare for verification. • Different components must be stored isolated, and mixing them together is strictly forbidden. The storage period is one year. RN*1 quartz sand of Wear-resistant surface harden Agent  Compendium RN*1Wear-resistant quartz sand floor harden Agentï&frac*4;Œuse high-quality quartz sand aggregate and concrete with mixing, laying on general concrete surface, making the high wear and impact resistance of industrial floor. Adoption of new technologies, make this materials with concrete surface can simultaneous application and form a whole. Have high wear-resistant and dust-proof of excellent performance.  Application • Industrial plants need to wear and impact resistance of the ground • Withstand heavy load and frequent work of regional • Requirements place clean and dustproof • Apply to old concrete of ground renovation project • Apply to public facilities and commercial areas such as shopping centers, hotels, schools, theaters, hospitals, car parks, sidewalks, roads, gardens, etc.  Characteristic • High-strength wear-resistantï&frac*4;šhave high strength after curing, wear-resistance and anti-erosion • Good integrityï&frac*4;šNo shrinkage no cracking, neat and beautiful • Impervious and corrosion-resistantï&frac*4;šResistant Oil permeabilityï&frac*4;Œcorrosion-resistant and easy to clean  Packaging and storage • This product is packed with moisture-proof bags, *5 kg / bag • Used in dry, ventilated, cool place with sealed save, shelf life of 6 months, more than six menstrual passing inspection before use. Special packaging can be stored 8 months  Work progress of dry method 1. Steel fabric coating 2. Concrete pouring 3. Concrete floor burnishing 4. Sprinkle powder for the first time 5. purifying slurry 6. Sprinkle powder for the second time 7. Burnishing of machinery 8. Artificial smooth the edges 9. Curing  Notes In the old concrete floor, can first use of concrete surface treatment agent, the late pouring fine stone concrete, for the application of wear-resistant surface layer (see above). Reference to the detailed description reference to the application specifications of RN Wear-resistant surface harden RN*2 carborundum of Wear-resistant surface harden agent  Compendium RN*2 carborundum of Wear-resistant surface harden agentï&frac*4;Œuse high-quality carborundum aggregate and concrete with mixing, laying on general concrete surface, making the high wear and impact resistance of industrial floor. Adoption of new technologies, make this materials with concrete surface can simultaneous application and form a whole. Have high wear-resistant and dust-proof of excellent performance.  Application • Industrial plants need to wear and impact resistance of the ground • Withstand heavy load and frequent work of regional • Requirements place clean and dustproof • Apply to old concrete of ground renovation project • Apply to public facilities and commercial areas such as shopping centers, hotels, schools, theaters, hospitals, car parks, sidewalks, roads, gardens, etc.  Characteristic • High-strength wear-resistantï&frac*4;šhave high strength after curing, wear-resistance and anti-erosion • Good integrityï&frac*4;šNo shrinkage no cracking, neat and beautiful • Impervious and corrosion-resistantï&frac*4;šResistant Oil permeabilityï&frac*4;Œcorrosion-resistant and easy to clean  Packaging and storage • This product is packed with moisture-proof bags, *5 kg / bag • Used in dry, ventilated, cool place with sealed save, shelf life of 6 months, more than six menstrual passing inspection before use. Special packaging can be stored 8 months  Work progress of dry method 1. Steel fabric coating 2. Concrete pouring 3. Concrete floor burnishing 4. Sprinkle powder for the first time 5. Purifying slurry 6. Sprinkle powder for the second time 7. Burnishing of machinery 8. Artificial smooth the edges 9. Curing  Notes In the old concrete floor, can first use of concrete surface treatment agent, the late pouring fine stone concrete, for the construction of wear-resistant surface layer (see above). Reference to the detailed description reference to the application specifications of RN Wear-resistant surface harden RN*1 ï&frac*4;­isfire of Wear-resistant surface harden agent  Compendium RN*1 ï&frac*4;­isfire of Wear-resistant surface harden agent is misfire mineral aggregate、 dolomite, marble, special cement and intermediate misfiring composed of wear-resistant materialsï&frac*4;Œmaking the high wear 、 impact resistance of industrial 、commercial flooringï&frac*4;ŒWear-resistant and misfire of performance on a concrete floor at present. Adoption of new technologies, make this materials with concrete surface can simultaneous application and form a whole. Have misfire 、wear-resistant, dust-proof、Resistant Oil permeability characteristics  Application • In need of special wear-resistant, have asked not produce a spark and dust-proof of industrial land • Withstand heavy load 、 frequent work and prohibited fireworks of regional • Anti-static and misfire special needs of place • High-grade, high-precision, advanced technology need to clean dust, anti-static and anti-explosion of site • Particularly applicable to chemical factories, warehouses, parking lots, etc. The shop wear-resistant layer is strictly prohibited fire  Characteristic • High-strength wear-resistantï&frac*4;šhave high strength after curing, wear-resistance and anti-erosion • Good integrityï&frac*4;šNo shrinkage no cracking, neat and beautiful • Impervious and corrosion-resistantï&frac*4;šResistant Oil permeabilityï&frac*4;Œcorrosion-resistant and easy to clean • Anti-static, does not produce crashing spark , can be used flammable and combustible of Production sites  Packaging and storage • This product is packed with moisture-proof bags, *5 kg / bag • Used in dry, ventilated, cool place with sealed save, shelf life of 6 months, more than six menstrual passing inspection before use. Special packaging can be stored 8 months  Work progress of dry method 1. steel fabric coating 2. Concrete pouring 3. Concrete floor burnishing 4. Sprinkle powder for the first time 5. Purifying slurry 6. Sprinkle powder for the second time 7. Burnishing of machinery 8. Artificial smooth the edges 9. Curing  Notes In the old concrete floor, can first use of concrete surface treatment agent, the late pouring fine stone concrete, for the application of wear-resistant surface layer (see above). Reference to the detailed description reference to the application specifications of RN Wear-resistant surface harden Construction Specification of RN Wearable Ground Harden Harden materials of grade level of RN wearable ground is composed of non-metallic minerals aggregate, metallic minerals aggregate and special additive. Wearable grade level has the advantages of high surface hardness, high density, wear resistance, no dirt and no stripping. Besides, it is also economic, applicable and widely used. Overall wearable grade level abandons the traditional application practices of separate concrete base from surface. Therefore it eliminates the quality problems of cracks and hollowing as the result of the poor combination of primary and surface, simplifies the process, shortens the application period and save the labor cost; and goes to get more and more widely used in factories, warehouses, docks, and other projects. Requirements of concrete foundation • Concrete base should be dry, moisture content should be less than 8%, no sand streaking and serious cracking phenomenon, and the intensity must be greater than *0Mpa. • The grass-roots should be thoroughly cleaned and wetted with water sufficiently to ensure the saturated absorbent capacity of primary and to avoid weak bonding power cause by rapid water loss when pouring the new concrete layer. It is better to sgraffito the base surface in order to make it bond with concrete strongly. • Support the framework on the longitude line after dealing with the base. The framework should be flat and firm, and designed by scale height of yard layout; and must be in steel form and be brushed with release agent. Detect the level at any time with the template level during application process, if there is any deviation, immediate adjustment should be carried out by wedge-shaped block. • Pour concrete in sub-grid positions divided by vertical and horizontal axis according to the application specifications on the site. Mechanical stirring is the best way, and water-cement ratio and the slump should be as lower as possible to reduce bleeding. Site slump is better to be controlled between *5mm to **0mm; the casting thickness is determined by site requirements, but not less than 6 cm in the thinnest. • Try to pouring concrete to a level at one time as much as possible, concrete materials should be used to make up and vibrate the parts that failing to meet the elevation while mortar is strictly forbidden. • Plate vibrators are used to vibrate during pouring time and a special steel roller is used to roll repeatedly. Beat pulp on columns, corners and other parts with float. After leveling the concrete, the surfaced thickness cement paste is at least 3mm. • After making pulp, leveling longitude lines with a ruler: First put ruler on the concrete surface, and then use the hands to rub and plane down in left-to-right direction with a little force and level longitude lines in one direction. Two-handed force in this process must be uniform. • Remove the bleeding with rubber tube or vacuum equipments after the completion of concrete pouring. Repeat the process two or more times, and then start the application of wear-resistant material. Constructors should wear flat shoes in the medium-term operational phase and waterproof paper shoes in the later period. Application of wearable ground harder First spread wear-resistant material, screed and plaster: The spreading time of Wear-resistant material changes with climate, temperature, concrete mix and other factors. Premature spreading of wear-resistant materials will make them sunk in concrete and lose their effect. Too late spreading will cause solidification of concrete and loss of its bond strength, so that wear-resistant materials cannot combine with it and peel off. Identification method of spreading time is to foot on it. If it sinks about 5mm, the first spreading application can begin. Water disappear quickly in Walls, pillars, doors and templates and other edges, so these edges should be spreading first to prevent reducing the effects due to water loss The first spreading amount is two-thirds of total consumption Mixture should drop down uniformly and cannot be thrown in force for it will separate. After the wear-resistant materials absorb some moisture, they will be triturated and dispersed in plaster knife machine and mixed with primary concrete. Spread wear-resistant material, screed and plaster in the second time Measure the level of degree with guiding rule or straight floating rule at first and adjust the uneven places of the first time spreading. Second spreading direction should be the first vertical direction. Second spreading amount is one-third of total consumption. Screed, plaster immediately right after the spreading and plaster at least two times. Plastering should be done uniformly in vertical and horizontal direction to prevent the material gathered. The edges are handled by wood float. If pressed with fingers and the surface material has slight subsidence, the plaster machine should adjust its speed and angle according to the hardening situation. When the machine is running, it should crisscross three or more times. Flatness requirements of Wear-resistant surface is two meters square, the maximum deviation is **5 mm, And the maximum deviation with high point and low point of the elevation is less than *0 mm. Surface modification and maintenance After fuman-ray machine operating the layer of still more messy wipe patterns, to eliminate the wiping the last using thin steel trowel orderly to floating, with the artificial calendar to complete the modification process Wear-resistant floor application **6 hours after the spraying curing agent to curingï&frac*4;Œthe usage of curing agent should be 0.2 L/㎡. Or cover the plastic film to prevent surface cracking. *4hours after the Wear resistant surface application can remove the frameï&frac*4;ŒBut should be noted that not damage the edge of floors Slotting After completion of **7 daysï&frac*4;Œ appropriate to cut to prevent irregular crackingï&frac*4;Œthe cut of gap should be **8mï&frac*4;ˆaccording to the distance of workshop Column to determine. Cut should be unified snap the line to ensure straight cutting neatly sewnï&frac*4;ŒCutting depth of floor thickness should be at least 1 / 5ï&frac*4;ˆThe proposed completed cutting seam by civil engineeringï&frac*4;‰Sealing of the material use pre-forming or cutting of the elastic resin materialï&frac*4;Œsuggest use airtight glue.

Send a direct inquiry to this supplier

To:

Mr. hongyou < Beijing Allied Rongda Engineering Material Co., Ltd. >

私は知りたい: