FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
Qingdao Port,CHINA
Price for Minimum Order:
-
Minimum Order Quantity:
1set
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
5sets
Payment Type:
-
連絡先担当者 Mr. bingren
westpingcheng zhonglu, Qingdao, Shandong
PVC pipe production line 1.*****0mm(single pipe), ****3 (double/four pipe ) 2. ABB inverter 3CE/ISO CERTIFICATE 4.Payment Termsï&frac*4;š L/C T/T 5.Packaging Detailsï&frac*4;š1)suitable for the sea shipmentï&frac*4;Œvacuum and wooden box packaging by the client request 6.Delivery Time 1~2 months PVC Pipe Production Line is specially designed for producing PVC pipe. PVC extrusion die: innovative spiral flowing structure avoids fuse mark appearance on the bigger pipe, profile of ideal dwell time is full of the whole flow cross-section, Homogeneous melt distribution with selective temperature control guarantees outstanding product characteristics for PVC materials. Vacuum calibration water tank: with visible stainless steel structure, With two-stage vacuum system in vacuum calibration tank for large diameter pipe, With accurate water level & water temperature automatic control system, With stable recycle liquid filter system. Spray cooling water tank: special spray ensure fast cooling effect, stainless steel effects environmental concept, With accurate water level & water temperature automatic control system with advanced valve& element. Hauling unit: Separate speed regulation and flexible hauling method, high-reliable transmission system ensures the high efficiency and high quality normal extrusion. Special integral transmission unit avoids asynchrony of individual transmission, Advanced four connecting rod structure makes self-centering of haul-off**9;s locating, accurate pressure regulating system makes hauling power adjustable. Cutting unit: Full-hydraulic design ensures flexible pressure in cutting state of pipes, Unique power input system ensures high reliability of planetary unit, With ultra silent & enforced sucking system, auto angle chamfer function. Adopt New Technology –Electromagnetic induction controller to control the electromagnetic heating ring, the electricity use ratio exceeds *8%, can save *0% electric energy.