FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
-
Delivery Time:
-
Supplying Ability:
-
Payment Type:
-
連絡先担当者 Ms. Jin
TongFuYu industrial zone,ShaJing Town, Shenzhen, Guangdong
1 Heating system 1. All the heating zones are controlled by PLC through PID 2. Heating separately according to different zones is workable to reduce starting power. 3. Turbo air system can improve air flow and provide high rising temperature. Soldering is accessible. 4. Upper hood with motor can be opened safely and reliably. 5 .Heater and motor designed with full modularization can be taken apart quickly to save time. 6. The speed of hot air can be adjusted by inverter; air speed can be set up according to different products to avoid soldering defect. Air speed coefficients: 1.**1.5 7. Convection way: single circle of hot air convection. 2 Conveyor system 1. Stainless chain with automatic lubrication, shrinkage and protection ensure stable conveyor. 2. Edge rail and meshwork convey synchronously, controlled through PID by computer. 3. High-strength rail frame assures small transfiguration and precision. 4. The rail width can be adjusted automatically by SPG gear motor. 5. Rails will be lubricated by central oil reservoir device controlled by computer. 6. Conveyor way: Edge rail meshwork 3 Cooling system 1. Long cooling zones provide optimum cooling performance. 2. Closed-loop control can be shared together by flux collecting system. 3. Cooling chiller modular can provide high cooling efficiency. 4 Flux collecting system 1. To keep inside chamber clean and ensures more environmental emission. 2. Three-layer filters employed is easy for cleaning and maintenance. 5 Controlling System 1. WIN-XP operation system makes the operation interface simple and friendlier. 2. Equipped with automatic PCB counting and sound