あなたはまだ TradeKey.com のメンバーではないようです。 今すぐサインアップして、世界中で700万を超える輸入業者および輸出業者と接続します。 今すぐ加入、無料 |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
l AAC Plant/AAC Production Line/Autoclaved aerated concrete system

l AAC Plant/AAC Production Line/Autoclaved aerated concrete system

FOB Price

Get Latest Price

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

1

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

-

今すぐお問い合わせください
無料会員

連絡先担当者 Mr. barry

Meixing Road 2001, Shanghai, Other

今すぐお問い合わせください

Description


Capacity: from ****0 cubic meter to **0, **0 cubic meters per year.
Equipments: stocking raw materials, mixing, molding, forming, cutting, evaporating and curing, crane cramp, transporting etc.,
1 Product weight is according to **0kg/m3 to control.
2 annual capacity **0, **0M3.
3 set raw material proportion: cement 6.5%, raw lime *3%, flyash *8%, gypsum 3%, aluminum paste powder **0g/M3.
4 water and material rate 0.**1
5 one mould product 2.*8M3
6 Casting slurry cycle time **6 minutes, cut cycle time 5 minutes.
7 casting slurry temperature ****2 degree
8 body quiet stop. Time is 1.**2.5housr, temperature ****0 degree, after quiet stop body strength is 0.***0.*8Mpa
9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 6 hours/1.6Mpa, total 6.5 hours.
*0.
Cement lime fly ash style aerated block raw material proportion
name unit Cement lime fly ash
flash % ****0
cement % ***5
lime % ****5
gypsum % **5
Aluminum powder paste(**0kg/m3) 1/****0 8
Water & material rate 0.***0.*5
Casting system OC ****0
Aluminum mixing time S ****0
*1. Cement lime Sand style aerated block raw material proportion
Name Unit Cement Lime Sand
Sand % ****5
Cement % ****0
Lime % ****0
Gypsum % **3
Aluminum powder paste(**0kg/m3) 1/****0 8
Water & material rate 0.***0.*5
Casting system OC ****8
Aluminum mixing time S ****0
Reference: cement is *2.5 Portland or *2.5 common cement
Aluminum power paste calculate to use according to **0kg/m3

Send a direct inquiry to this supplier

To:

Mr. barry < Shanghai Tianjin Machinery Co., Ltd >

私は知りたい: