FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
as costomer's request
Delivery Time:
within 45 working days after receipt of deposit
Supplying Ability:
10 Set per Month
Payment Type:
T/T, L/C
連絡先担当者 Joy
Yingbin Road, Botou, Hebei
Ridge cap machine
1. The chart of process flow
Decoiling*- active feeding*- roll forming*-measuring length*- cutting to length*- product to stand
2. Main equipment
Main forming machine, hydraulic cutter, hydraulic system, electric system.
3. Technical parameters
1) main forming machine
A. Number of forming steps: *0
B. Material of shaft: *5# steel adjustable treatment. Outer diameter: *0mm
C. Main motor power: 5 kw
D. Forming speed: **5m/min pressing depth:*0mm
E. Stand: **0# steel welding
F. The plating chromium of roller surface: 0.*5mm
G. Total weight: 3.2T
2) hydraulic cutter
A. Material of blade: Cr*2 with quenched treatment ****2
B. Cutting system: adopt advanced hydraulic drive, automatic cut after forming, no distortion, no waste, high safe factor( main motor stops and then cuts)