FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
600 Ton
Packaging Detail:
packed with steel or based on the customers' requirments.
Delivery Time:
20 days after order confirmed.
Supplying Ability:
600 Ton per Month
Payment Type:
T/T, L/C, PayPal
連絡先担当者 Yoyo
Dali, Foshan, Guangdong
Standard
|
Composition
|
C
|
Mn
|
Si
|
Cr
|
P
|
S
|
Mo
|
V
|
GB/T********0
|
%
|
0.*0/0.*0
|
≦0.*0
|
≦0.*0
|
2.*0/2.*0
|
≦0.**5
|
≦0.**0
|
7.*0/9.*0
|
0.*0/0.*0
|
Heat Treatment
|
Hardening:***0~***0℃,Oil
cooling,HRC=****4
|
|
Temper:**0~**0℃,Temper for twice,2h per
time,HRC=****0
|
|
Anneal:Isothermal annealing temperature of
**0~**0℃;isothermal temperature of
**0~**0℃
|