FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
plywood
Delivery Time:
20 days
Supplying Ability:
-
Payment Type:
PayPal, L/C, T/T
China
連絡先担当者 Mr. Kevin
No.263, south Tai bai Road, Xian, Shaanxi
Special technical services of the case which passed stability test by 3Q
Through a series activities such as: DQ (design confirmation),
FAT (Manufacturers factory test), IQ (installation qualification),
OQ (Operation confirmation), PQ (operating performance
confirmation), the data and conclusions can prove that if the
equipment can meet the requirements of production process, if
equipment performance meet the requirements of design &
products and GMP standard.
1. Purpose of DQ: according to customer
demand and production process, by compare with contract and drawing
in order to review equipment performance, material, structure,
accessories, control, instrument, etc, to confirm the rationality
and reliability of products in design process.
2. Purpose of FAT: through a series of
experimental test by manufacture proves the quality and reliability
of the equipment before delivery also prove the equipment can
satisfy the basic requirements of design confirmation, products
standard and international requirements of GMP.
3. Purpose of IQ: by installation,
commissioning and validation activities,a series of data were
offered to validate if installation documents & conditions
& outcome of stability testing case can comply with the design
requirements, datum and document can meet the requirements of GMP
management.
4. Purpose of OQ: check instrumental and
test report supplied by validate side at first, check and test
equipment technology parameter, confirm the operation of equipment
performance meet the design requirements, and related requirements
in accordance with GMP requirements.
5. Purpose of PO: by the qualification of
installation and operational confirmation, test corresponding
sample based on the specific craft of customer manufacturer,
confirm the operation of equipment performance meet the design
requirements, and related requirements in accordance with GMP
requirements.
The new generations of stability test chamber, assemble year’s
experience of design and production, and introduce into German
technology, breach the defect of existing cast which can not endure
long time and continuous operation. It adopting advanced technology
of double compressor takes turns switch, and main imported parts
performance is stable and reliable.
1. Imported closed compressor, use
R**4a environmental protection refrigerants, low noise, high
efficiency, long service life.
2. Imported touch screen controller, large process control, a
precise and reliable control, with R**2 interface.
3. Data record, online data acquisition, imported recorder
with paper, two data recording mode selection.