FOB Price
Get Latest Price|
Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
packing in container, bulk or nude
Delivery Time:
within 30 days
Supplying Ability:
10 Set per Month
Payment Type:
T/T, L/C
連絡先担当者 faier
Zhengzhou, Henan
ã€Function
】
Ferry push car is a necessity for various steam cured products
manufacturers to connect pressing section with steam curing section
for reversing drag. This product is designed on the basis of
imported products. It features by powerful drag and push. The car
can do accurate stop, location and track connection after fast
transverse movement; it also can do frequency conversion slow speed
movement when carrying load and frequency conversion fast speed
movement when returning. The car is equipped with longitudinal
power set which can drag and push *0 steam curing dollies loaded
with 3t products.
ã€Productive Process of
Aerated Concrete】
(1).Production Process of Aerated Concrete According to the
category and quality of raw material, and the features of
equipment, the aerated concrete can be manufactured in different
processes. Generally, add water to ash, silica sand or slag and
crush them into slurry;
(2) . Then add powdery lime, cement of right amount, plaster,
vesicant, foam stabilizer, and mix and pour it to mould frame;
(3).After curing, foaming and hardening, cut it into blocks and
boards in different specifications;
(4).Finally, transport it into pressure steamer with
steam-curing cart, and get the light cellular concrete after
steam-curing with high temperature and pressure.
ã€Process Flow of an Annual Output *0,**0m******0,**0m3 Aerated Concrete Steam-Curing Production】
(1) Various raw material storage tanks → (2) Mix dosing → (3) add water to raw material and mix them → (4) prepare the mould → (5) pour → (6) foam and wait → (7) release from mould → (8) turn up, cut horizontally and vertically → (9) make into groups and get into autoclave → (*0) cure under high temperature and pressure → (*1) release the finished products from the autoclave → (*2) test the finished products → (*3) pack → (*4) stack and store up → (*5) leave the factory.