Common
equipment used for Copper ore Concentration Process
Equipment commonly used for copper ore processing includes: jaw
crusher, fine crusher, ball mill, swaying or chute feeder, spiral
classifier, mixing tank, flotation machine.
Concentration Process for
CopperOreSelecting:
1. Crushing and grinding stage
The extracted ore should be crushed by jaw crusher initially and
then by fine crusher. When it gets the reasonable fineness, it is
transported into ball mill by elevating conveyer and feeder, and is
milled by ball mill.
2. Classifying stage The subtle
milled ore gets the next procedure: classification. There is a
theory that if the weights of solid particles are different, the
sedimentations will be different, and the mixed ore can be
classified by screw classifier.
3. Mixing and Floatation stage
The classified ore gets into mixing tank for fully mixing. At this
stage, chemical agent for foam can be added. After fully mixing,
the slurry will enter into flotation
machine.
When the floatation machine
works, the motor drives the impeller to revolve, so the centrifugal
effect and negative pressure are produced. On one hand, ample air
is absorbed and mixed with mineral slurry, on the other hand, the
mixed mineral slurry is mingled with additive, meanwhile, the foams
are thinning, the mineral is bounded with foams, and floats up to
the surface of mineral slurry and the mineralized foam is formed.
The liquid surface can be adjusted with the height of adjustment
flashboard, so that the useful foams are scraped with squeegee.
4. Concentrator thickening and
drying Then copper concentrate is separated from others. Since the
separated ore are wet, they should be dewatered by thicker
initially, and dried by dryer.
Our service can supply for you:
1. Proving beneficiation
technology and consultation
2. Raw ore testing and
evaluation
3. Site chosen consultation and
evaluation.
4. Site design and layout
design.
5. Installation, erection, and
commissioning instruction
6. Workers training.
Pls feel free to contact us by supplying
the following information: What are the raw material and its size?
What is the raw material element analysis? if you have, pls send us
the raw ore element analysis report and copper ore phase analysis.
What is the capacity? What is the concentrate grade you
need?